DEVELOPER / CONTRACTOR SELF-INSPECTION FORM
INSPECTION LOG
The site shall be inspected before storm events with a 40% chance of 0.25 inches or greater of predicted precipitation,
and after actual precipitation, and documented on the Construction Site Inspection Checklist Form. Incidents of
noncompliance must be reported to the Field Engineer. A log of all inspections, as shown below, should be kept
current and maintained at the job sites at all times.
Observations
- if post-storm -
TYPE OF INSPECTION
inspection, note size
Date
Inspector
of storm in inches
Routine
Pre-storm
Post-storm