Minneapolis Residential Construction Management Agreement

ADVERTISEMENT

Minneapolis Residential Construction Management Agreement
This agreement applies to all un-occupied construction projects of wrecking, new build, or major remodeling of
1 and 2 unit dwelling structures.
The undersigned hereby acknowledges that they are responsible for complying with the conditions listed below. Failure to do so may
.
result in fines and/or construction delays
Project Address:
Permit #
Date Issued:
Proposed Start Date:
Proposed Completion Date:
Applicant Name:
Applicant Contact Name:
Applicant Address:
Applicant Office Phone:
Applicant Cell Phone:
Applicant Signature:
Date:
Contractor Name:
Contractor Contact Name:
Contractor Address:
Contractor Office Phone:
Contractor Cell Phone:
Contractor Signature:
Date:
This agreement must be attached to approved site plans and be present on-site at all times during active construction.
Failure to post and follow agreement may result in fees/fines and/or immediate STOP Work orders.
1. Hours of Operation: Operation of construction equipment is allowed only between the hours of 7:00 a.m. to 6:00
p.m., Monday through Friday and shall not be allowed to take place during federal holidays. Operation of
construction equipment outside of these hours and days without an after-hours permit from the Minneapolis
Health Department is prohibited. (Minneapolis Code 59.30) Each day of failure to obtain a permit or maintain
compliance with an issued permit constitutes a separate violation of this Code.
2. Noise Reduction: All contractors shall plan for and effectively implement measures that prevent adverse effects
upon adjacent property owners including the public right of way as set forth in section 389.60. The Contractor
shall implement reasonable measures to mitigate nuisance noise by limiting use of noise generating equipment,
vehicles, and avoid using such equipment in immediate proximity to an adjacent residential use to the extent
reasonable.
3. Approved Plans: An approved/stamped set of building (construction) plans shall be present and available on site
as required by Minnesota State Building Code (MSBC1300.0130)
4. Contact Information: Prior to any work done on the permit site, a sign must be posted identifying the nature of the
construction activity, the permit holder, a contact name and phone number, the site address, and a contact phone
number at the city to report problems (311/911 unless directed by City of Minneapolis Staff). The sign shall be
24” x 36” in size with readable lettering as viewed from the street. All information must remain current and the
sign must be posted, without obstruction, in the front yard until completion of the work.
5. Neighbor Notification: At least fifteen (15) calendar days before any construction begins on the permit site, the
permit holder shall provide mailed notice to all property owners within three hundred fifty (350) feet of the permit
site inviting them to a neighborhood informational meeting. Mailing labels are available through Hennepin
County Property Division. The meeting shall be held at least five (5) days before any construction commences
and shall be held within three (3) miles of the permit site. Topics discussed must include the construction plans,
hours of operation, work schedule, estimated completion date, erosion and sediment control, dumpster location,
noise mitigation, dust control, portable bathroom location, debris removal schedule, and site placement for
building materials and equipment. The permit holder shall maintain a copy of the written meeting notice, the
MCMA 6/18/15