BUILDING WORK STANDARD CONTRACT
Produced by Birmingham Trading Standards
Many problems with building work arise because of misunderstandings, between the customer and
contractor over the work to be done and the price to be paid, particularly if there is no written agreement.
This simple standard contract, devised by Birmingham Trading Standards, is intended to give you, the
consumer, some idea of the details that need to be checked with a contractor and put in writing before a
building work contract is entered into.
Whilst the checklist attempts to include the basic terms of the
contract it is obviously not possible to cover every eventuality. It may therefore be necessary to add to the
checklist to cover an individual consumer's particular requirements. In the event of any problem contact
your local Trading Standards. If you live in Birmingham our number is 0121 303 6031, or visit us at the
Consumer
Centre,
155-157
Corporation
Street,
Birmingham
B4
4PH.
Our
e-mail
address
is
.
tradingstandards@birmingham.gov.uk
CUSTOMER:
CONTRACTOR: Is it a limited company?
If not state individual's name
Name_______________________________________________________ Name________________________________________________________________
Address____________________________________________________ Address______________________________________________________________
_____________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________
Tel No. (home)__________________(work)___________________
Tel. No. _____________________________________________________________
THE JOB:
1. Work to be done
(List all the work you have asked the contractor to carry out)
_____________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________
If there is not sufficient space to list everything attach a sheet of paper.
Materials to be used
2.
(List the type, quality and measurement of materials agreed upon e.g. type of bricks, window frames, loft insulation - get
samples if possible).______________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________
Note those materials to be supplied by the customer and when they are needed by the contractor
3. Date work will commence
(Ask the contractor to give you a starting date. If it is essential that work should start on this date make a written note
of this).
_____________________________________________________________________________________________________________________________________
4. Date work will be completed
(Ask the contractor to give a date (even if approximate) as to when the work will be finished. Again, if the work must be
completed by a certain date, make a written note of this).
_____________________________________________________________________________________________________________________________________
If the contractor fails to start or complete work by a date noted above as essential, then you may be entitled to
compensation for unavoidable losses due to the delay. However this will not apply where the contractor is unavoidably
delayed by circumstances either outside his control (e.g. weather) or caused by you (e.g. changing the work to be done).
5. Will a sub-contractor be used? If so name of sub-contractor.
(Name and Address of any other contractor that may be employed by the main contractor).
_____________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________
THE PRICE
1. Price Agreed
(It is essential to obtain a final fixed price or written quotation from the contractor. Remember an estimate is not binding.
Check whether this price includes V.A.T.)
______________________________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________________________

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business
Go
Page of 2