Sample Post Schedule For A File Capture

ADVERTISEMENT

NOTE THAT THIS IS A SAMPLE POST SCHEDULE FOR A FILE CAPTURE
AND HD FINISH.
EVERY FILM IS DIFFERENT AND THIS SHOULD NOT BE TAKEN AS
GOSPEL. THIS IS MEANT ONLY AS A SAMPLE OF THE TYPE OF DETAIL
AND TIME FRAME THAT YOUR FILM MIGHT TAKE.
My 581 Film – The Early Years
Post Production schedule
as of June 1, 2020
John Producer, Producer
(213/987-6543)
Alice Director, Director
(310/210-9876)
Pat Editor, Editor
(323/543-2109)
Wil Post, Post Production Supervisor (888/876-5432)
JUN 29
Shoot video for Sc. 11 playback
JUNE 30
Record music for Sc. 7 playback
Begin editing Sc. 11 playback material
JUL 1
Complete editing Sc. 11 Video playback
JUL 4
INDEPENDENCE DAY (Holiday)
JUL 5-8
Complete video playback Sc. 11
Create video playback tape
JUL 11-13
Complete music playback Sc. 7
Create music playback tape (DA-88)
JUL 15-22
PRODUCTION
JUL 16
Capture Day 1 pix files and sound dailies to
Editor drive
Sync dailies
JUL 17
Capture Day 2 pix files and sound dailies to
Editor drive
DVD of Day 1 dailies to director
Sync dailies
JUL 18
Capture Day 3 pix files and sound dailies to
Editor drive
DVD of Day 2 dailies to director
Sync dailies
JUL 19
Capture Day 4 pix files and sound dailies to
Editor drive
DVD of Day 3 dailies to director
Sync dailies
Begin editing
My 581 Film – Post Sked
Page 1
as of 6/1/2020

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business
Go
Page of 5