Software Change Control Log Page 2

ADVERTISEMENT

INSTRUCTIONS FOR COMPLETING THE SOFTWARE CHANGE CONTROL LOG
This change control log form is included as a suggested format for recording and maintaining software change request
data, including changes to documentation. A Detailed Status Information form is available to record supplementary
details. The log and software change requests should be maintained in the Systems Project Notebook.
________________________________________________________________________________________________
______
FIELD
DEFINITION
Page #:
Enter the appropriate page number of the log sheet.
Log Date:
Enter the date control log was started.
System Name:
Enter the name and acronym of the system to be managed.
SCR #:
Enter the unique sequential number assigned to each request on the SCR form.
Reqmnt #:
Enter the number of the requirement to be changed (if known) on the SCR form.
Date Submitted:
Enter the date the SCR was submitted to DOE or Contractor.
Priority:
Enter the priority from the SCR form using the first character of the priority; e.g.,
E = Emergency, U = Urgent, and R = Routine.
Approval:
This area is for recording SCR approval information obtained from the SCR form.
Change Approved:
Enter the date the SCR was approved.
Change Not Approved:
Enter the date the SCR was disapproved.
Hold (Future Enhancement):
Enter the date the SCR was placed on "Hold."
Status:
This area is for recording basic information about the status of a SCR.
Technical Evaluation Phase:
Enter the date the technical evaluation of the SCR
commenced.
Change In-Progress:
Enter the date work began on the SCR. Usually, the
areas "Technical Evaluation Phase" (if applicable) and
"Change Approved" should be entered prior to posting
the "Change In-Progress" date. Work on most SCRs
should not be initiated without a technical evaluation and
formal approval in the SCR.
Canceled:
Enter the date the SCR was canceled.
Target Date:
Enter the estimated date that the SCR will be completed
and ready for release/implementation.
Date Complete:
Enter the actual date the SCR was implemented.
SCC Log V1.0 (8/8/99)

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Miscellaneous
Go
Page of 3