Dd Form 1692/2 - Engineering Change Proposal

Download a blank fillable Dd Form 1692/2 - Engineering Change Proposal in PDF format just by clicking the "DOWNLOAD PDF" button.

Open the file in any PDF-viewing software. Adobe Reader or any alternative for Windows or MacOS are required to access and complete fillable content.

Complete Dd Form 1692/2 - Engineering Change Proposal with your personal data - all interactive fields are highlighted in places where you should type, access drop-down lists or select multiple-choice options.

Some fillable PDF-files have the option of saving the completed form that contains your own data for later use or sending it out straight away.

ADVERTISEMENT

Form Approved
ENGINEERING CHANGE PROPOSAL (ECP), PAGE 3
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 2 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including
suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway,
Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of
information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THIS ADDRESS. RETURN COMPLETED FORM TO THE
ECP NUMBER
GOVERNMENT ISSUING CONTRACTING OFFICER FOR THE CONTRACT/PROCURING ACTIVITY NUMBER LISTED
IN ITEM 2 OF THE COMPLETED DD FORM 1692.
EFFECTS ON PRODUCT CONFIGURATION DOCUMENTATION, LOGISTICS AND OPERATIONS
(X)
FACTOR
ENCL.
PAR.
(X)
FACTOR
ENCL.
PAR.
37. EFFECT ON PRODUCT CONFIGURATION
39. EFFECT ON OPERATIONAL
DOCUMENTATION OR CONTRACT
EMPLOYMENT
a. SAFETY
a. PERFORMANCE
b. SURVIVABILITY
b. WEIGHT-BALANCE-STABILITY (Aircraft)
c. RELIABILITY
c. WEIGHT-MOMENT (Other equipment)
d. MAINTAINABILITY
d. CDRL, TECHNICAL DATA
e. SERVICE LIFE
e. NOMENCLATURE
f. OPERATING PROCEDURES
g. ELECTROMAGNETIC INTERFERENCE
38. EFFECT ON INTEGRATED LOGISTICS
SUPPORT (ILS) ELEMENTS
h. ACTIVATION SCHEDULE
a. ILS PLANS
i. CRITICAL SINGLE POINT FAILURE
ITEMS
b. MAINTENANCE CONCEPT, PLANS AND
PROCEDURES
j. INTEROPERABILITY
c. LOGISTICS SUPPORT ANALYSES
d. INTERIM SUPPORT PROGRAMS
e. SPARES AND REPAIR PARTS
40. OTHER CONSIDERATIONS
f. TECH MANUALS/PROGRAMMING TAPES
a. INTERFACE
g. FACILITIES
b. OTHER AFFECTED EQUIPMENT/GFE/GFP
h. SUPPORT EQUIPMENT
c. PHYSICAL CONSTRAINTS
i. OPERATOR TRAINING
d. COMPUTER PROGRAMS AND
j. OPERATOR TRAINING EQUIPMENT
RESOURCES
k. MAINTENANCE TRAINING
e. REWORK OF OTHER EQUIPMENT
l. MAINTENANCE TRAINING EQUIPMENT
f. SYSTEM TEST PROCEDURES
m. CONTRACT MAINTENANCE
g. WARRANTY/GUARANTEE
h. PARTS CONTROL
n. PACKAGING, HANDLING, STORAGE,
TRANSPORTABILITY
i. LIFE CYCLE COSTS
41. ALTERNATE SOLUTIONS
42. DEVELOPMENTAL STATUS
43. RECOMMENDATIONS FOR RETROFIT
44. WORK-HOURS PER UNIT TO INSTALL RETROFIT KITS
45. WORK-HOURS TO CONDUCT SYSTEM TESTS AFTER RETROFIT
a. ORGANIZATION
b. INTERMEDIATE
c. DEPOT
d. OTHER
47. IS CONTRACTOR FIELD SERVICE
46. THIS CHANGE MUST BE ACCOMPLISHED
48. OUT OF SERVICE TIME
ENGINEERING REQUIRED?
AFTER THE FOLLOWING
BEFORE
WITH
YES
NO
CHANGES
49. EFFECT OF THIS ECP AND PREVIOUSLY APPROVED ECP’S ON
50. DATE CONTRACTUAL AUTHORITY NEEDED FOR (YYYYMMDD)
ITEM
a. PRODUCTION
b. RETROFIT
DD FORM 1692/2, AUG 96 (EG)
PREVIOUS EDITION MAY BE USED.
Designed using Perform Pro, WHS/DIOR, Aug 96
Reset Form

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business
Go