Contractor'S Material And Test Certificate

Download a blank fillable Contractor'S Material And Test Certificate in PDF format just by clicking the "DOWNLOAD PDF" button.

Open the file in any PDF-viewing software. Adobe Reader or any alternative for Windows or MacOS are required to access and complete fillable content.

Complete Contractor'S Material And Test Certificate with your personal data - all interactive fields are highlighted in places where you should type, access drop-down lists or select multiple-choice options.

Some fillable PDF-files have the option of saving the completed form that contains your own data for later use or sending it out straight away.

ADVERTISEMENT

Texas Department of Insurance
Mail Code 112-FM
State Fire Marshal’s Office
333 Guadalupe • P. O. Box 149221, Austin, Texas 78714-9221
512-305-7900 • 512-305-7922 fax •
U
Contractor's Material and Test Certificate for
nderground Piping
PROCEDURE
Upon completion of work, inspection and tests shall be made by the contractor’s representative and witnessed by an owner’s representative. All defects shall be corrected
and system left in service before contractor’s personnel finally leave the job.
A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and the contractor. It is understood the
owner’s representative’s signature in no way prejudices any claim against contractor for faulty material, poor workmanship, or failure to comply with approving authority’s
requirements or local ordinances.
Property Name
Date
Property Address
City
State
Zip
Accepted by approving authorities (names)
Address
PLANS
Installation conforms to accepted plans
Yes
No
Equipment used is approved
Yes
No
If no, state deviations
Has person in charge of fire equipment been instructed as to location of
control valves and care and maintenance of this new equipment?
Yes
No
If no, explain
Have copies of appropriate instructions and care and maintenace
INSTRUCTIONS
charts been left on premises?
Yes
No
If no, explain
Supplies buildings
LOCATION
Pipe types and class
Type joints
UNDERGROUND
Pipe conforms to
_________________
Standard
Yes
No
PIPES AND
Fittings conform to
_________________
Standard
Yes
No
JOINTS
If no, explain
Joints needed anchorage clamped, strapped or blocked in
Yes
No
accordance with _________________ standard
If no, explain
FLUSHING: Flow the required rate until water is clear as indicated by no collection of foreign material in burlap bags at outlets such as hydrants and
blow-offs. Flush at flows not less than 390 GPM (1476 L/min) for 4-inch pipe, 880 GPM (3331 L/min) for 6-inch pipe, 1560 GPM (5905 L/min) for 8-
inch pipe, 2440 GPM (9235 L/min) for 10-inch pipe, and 3520 GPM (13323 L/min) for 12-inch pipe. When supply cannot produce stipulated flow rates,
obtain maximum available.
HYDROSTATIC: Hydrostatic tests shall be made at not less than 200 psi (13.8 bars) for two hours or 50 psi (3.4 bars) above static pressure In
TEST
excess of 150 psi (10.3 bars) for two hours.
DESCRIPTION
LEAKAGE: New pipe laid with rubber gasketed joints shall, if the workmanship is satisfactory, have little or no leakage at the joints. The amount of
leakage at the joints shall not exceed 2 quarts per hour (1.89 L/hr) per 100 joints irrespective of pipe diameter. The leakage shall be distributed over
all joints. If such leakage occurs at a few joints, the installation shall be considered unsatisfactory and necessary repairs made. The amount of
allowable leakage specified above can be increased by 1 fl oz per inch valve diameter per hour (30 mL/25 mm/hr) for each metal seated valve isolating
the test section. If dry barrel hydrants are tested with the main valve open so the hydrants are under pressure, an additional 5 oz per minute (150
mL/min) leakage is permitted for hydrant.
New underground piping flushed according to
_________________ standard by (company)
Yes
No
If no, explain
How flushing flow was obtained
Through what type of opening
Public water
Tank or reservoir
Fire pump
Hydrant butt
Open pipe
FLUSHING
Lead-ins flushed according to _______________ standard by (company)
Yes
No
TESTS
If no, explain
How flushing flow was obtained
Through what type of opening
Public water
Tank or reservoir
Fire pump
Y connection to flange spigot
Open pipe
U
SF042 Rev. 07/09
Page 1 of 2
Contractor’s Material and Test Certificate for
nderground Piping

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Legal
Go
Page of 2