AWS D1.2/D1.2M:2008
ANNEX F
WELDING PROCEDURE SPECIFICATION (WPS)
Cleaning
Pass
Welding
Travel
Initial cleaning oxide____________________________
No.
Process
Amps
Volts
Speed
Initial cleaning oil and dirt________________________
Interpass cleaning _____________________________
____________________________________________
Postweld Heat Treatment
Original temper ________________________________
Final temper __________________________________
Temperature __________________________________
Time ________________________________________
Quench ______________________________________
____________________________________________
Process(es)
Process _______________
Type*_______________
Process _______________
Type*_______________
Electrode (GTAW) _____________________________
____________________________________________
Technique
Stringer or weave bead _________________________
Orifice or gas cup size __________________________
Oscillation ___________________________________
Contact tube to work distance ____________________
Single pass or multipass ________________________
per side
Tungsten extension ____________________________
Method of backgouging _________________________
Other _______________________________________
____________________________________________
____________________________________________
____________________________________________
____________________________________________
*Manual, automatic, polarity, pulse, etc.
Form F(a) (Continued)
Sketch of Welding Sequence
153