AWS D1.2/D1.2M:2008
ANNEX F
WELDING PROCEDURE SPECIFICATION (WPS)
FOR STUD WELDING APPLICATIONS
Specification No. _______________
Date _________________________
Approved _______________________
Revisions _____________________
Date _________________________
Approved _______________________
Revisions
_____________________
Date
_________________________
Approved
_______________________
Revisions
_____________________
Date
_________________________
Approved
_______________________
Revisions
_____________________
Date
_________________________
Approved
_______________________
Supporting PQR Numbers ________________
_______________
________________
________________
Supporting PQR Numbers
________________
_______________
________________
________________
_______________________________________________________________________________________________
Joints
Base Metals
Stud Base Sketch
M-No. _________________
Specification _________
Thickness ______________
to __________________
Alloy and Temper _______________________________
Pipe or Tube Diameter ___________________________
Alloy and Temper _______________________________
Stud Materials
F-No. _________________
Specification _________
Stud Diameter _________________________________
Other ________________________________________
_____________________________________________
Welding Process
_____________________________________________
Arc Stud Welding ______________________________
_____________________________________________
Capacitor Discharge____________________________
Shielding Gas
Contact Method _____________________________
Shielding Gas(es)_______________________________
Gap Method ________________________________
Percent Composition ____________________________
Drawn Arc Method ___________________________
Flow Rate _____________________________________
Cleaning
Other ________________________________________
Initial Oxide Cleaning ___________________________
_____________________________________________
____________________________________________
Ferrules
Initial Oil & Dirt Cleaning ________________________
Ferrule Material ________________________________
____________________________________________
Ferrule Specification ____________________________
Machine Settings
Ferrule Description______________________________
Power Supply Make ____________________________
_____________________________________________
Stud Gun Model _______________________________
Model No. _____________________________________
Current/Polarity _______________________________
Timer Range Setting ____________________________
Amperage Range Setting________________________
Capacitance or Power Tap Setting __________________
Stud-to-work Distance __________________________
Other ________________________________________
Lift Setting ___________________________________
_____________________________________________
Cable Size _____________
Length______________
_____________________________________________
Form F(d)
157