Federal Communications Commission
Approved by OMB
Washington, D. C. 20554
3060-0407
INSTRUCTIONS FOR FCC 337
APPLICATION FOR EXTENSION OF TIME TO CONSTRUCT
A DIGITAL TELEVISION BROADCAST STATION
may sign the application for his or her client, but only in
GENERAL INSTRUCTIONS
cases of the applicant’s disability or absence from the
A.
This FCC Form is to be used by all permittees to apply
United States. If the application is filed electronically,
for an extension of time within which to construct a
the signature will consist of the electronic equivalent of
commercial or noncommercial educational digital
the typed name of the individual. See Report and Order
television (DTV) broadcast station.
The DTV
in MM Docket No. 98-43. 13 FCC Rcd 23056, 23064
construction timetable established by the Commission is
(1998), on reconsideration, 14 FCC Rcd 17525 (1999).
set forth in 47 C.F.R. Section 73.624(d)(1). FCC Form
337 should be filed at least 60 days, but no more than 90
days, prior to the applicable construction deadline. See
QUESTION-BY-QUESTION INSTRUCTIONS
47 C.F.R. Section 73.624(d)(3).
A.
Item 1: Applicant Name.
The legal name of the
B.
This FCC Form must be filed electronically. Paper
applicant must be stated exactly in Item 1.
If the
versions of FCC Form 337 will not be accepted for
applicant is a corporation, the applicant should list the
filing, unless accompanied by an appropriate request for
exact corporate name; if a partnership, the name under
waiver of the electronic filing requirement. Filers can
which the partnership does business; if an unincorporated
access the electronic filing system via the Internet from
association, the name of an executive officer, his/her
the
Media
Bureau’s
Web
site
at:
office, and the name of the association; and, if an
individual applicant, the person’s full legal name.
C.
Applicants should provide all information requested by
Applicants should use only those state abbreviations
this application. If any portions of the application are not
approved by the U.S. Postal Service.
applicable, the applicant should so state. Defective or
incomplete applications will be returned without
FCC Registration Number (FRN). To comply with the
consideration. Inadvertently accepted applications are
Debt Collection Improvement Act of 1996, the applicant
also subject to dismissal.
must enter its FRN number, a ten-digit unique entity
identifier
for
anyone
doing
business
with
the
D.
In accordance with 47 C.F.R. Section 1.65, applicants
Commission. The FRN can be obtained through the
have a continuing obligation to advise the Commission,
FCC webpage at
or by manually
through amendments, of any substantial and material
submitting FCC Form 160. FCC Form 160 is available
changes in the information furnished in this application.
for downloading from
/formpage.
This requirement continues until the FCC action on this
html
or by calling 1-800-418-3676.
Questions
application is no longer subject to reconsideration by the
concerning the FCC Registration Number can be directed
Commission or review by any court.
to the Commission’s Registration System help desk at
or by calling 1-877-480-
3201.
E.
A copy of the completed application and all related
exhibits shall be made available for inspection by the
Facility ID Number. TV Facility ID Numbers can be
public in the applicant’s public inspection file pursuant
obtained
at
the
FCC’s
Internet
Website
at
to 47 C.F.R. Sections 73.3526 or 73.3527, unless the
Once at this website, scroll down and
applicant requests confidentiality consistent with 47
select CDBS Public Access. You can also obtain your
C.F.R. Section 0.459.
TV Facility ID Number by calling (202) 418-1600.
Further, the Facility ID Number is now included on all
F.
The applicant must sign the application. Depending
TV authorizations and postcards.
on the nature of the applicant, the application should be
signed as follows: if a sole proprietorship, personally; if
B.
Item 2: Contact Representative. If the applicant is
a partnership, by a general partner; if a corporation, by
represented by a third party (for example, legal counsel),
an officer; for an unincorporated association, by a
that person’s name, firm or company, mailing address
member who is an officer; if a governmental entity, by
and telephone/electronic mail address may be specified
such duly elected or appointed official as is competent
in Item 2.
under the laws of the particular jurisdiction. Counsel
All previous editions obsolete
.
FCC 337 Instructions
January 2008