Form Ador 10313 - Contractor'S Certificate Instructions - State Of Arizona

ADVERTISEMENT

Contractor’s Certificate Instructions
GENERAL INSTRUCTIONS
RETROACTIVE EFFECT
In order to ensure the effectiveness of the Certificate, all required
If a Certificate is not signed contemporaneously to the
fields must be completed.
commencement of a contracting project intended to be within the
scope of the Certificate, the Department of Revenue will accept
A. The “NAME”, “ADDRESS”, and “TPT LICENSE NUMBER”
the certificate as evidence of the alleged facts. However, the
fields of the Contractor section must be completed.
person receiving the certificate may not receive the benefit of the
The contractor is the entity responsible for the tax.
certificate if the Department determines that any of the facts set
forth in the certificate are inaccurate.
B. The “NAME”, “ADDRESS”, and “TPT LICENSE” fields of the
ASSUMPTION
OF
PRIME
CONTRACTING
TPT
Subcontractor section must be complete.
LIABILITY
C. Either the “Single Project Certificate” box or the “Blanket
In most instances, the entity assuming the prime contracting
Certificate” box of the Type of Certificate section must be
transaction privilege tax liability for the prime contracting
checked.
project(s) referenced in the Certificate will legally be the prime
 If the Single Project Certificate box is checked, the
contractor for such project(s). However, in some instances such
“PROJECT DESCRIPTION” must be supplied.
The
entity may not legally be the prime contractor for such project(s).
project description must be sufficient to identify the
If an entity is not the prime contractor for such project(s), the
location of the single project or the Certificate will be
Certificate will nevertheless be effective and will subject such
deemed incomplete by the Department of Revenue.
entity to the transaction privilege tax liability of the entity receiving
the certificate.
 If the Blanket Certificate box is checked, either the
“From: Through:” box or the “Until revoked” box
must be checked.
If the “From: Through:” box is
checked,
the
“From:
Through:”
dates
must
be
provided.
The “Specific Exceptions” box is optional
and allows the “Prime Contractor” to exclude Specific
projects or time periods from the Blanket Certificate
If
the
“Specific
Exceptions”
is
checked,
details
describing the excluded project(s) or the excluded
time periods must be provided.
 The “SIGNATURE”, “TITLE”, “PRINT NAME” and
“DATE SIGNED” FIELDS of the Signature section
must be completed.
Failure to complete these fields as specified may result in the
Arizona Department of Revenue disregarding the incomplete
Certificate.
This Form Superseded All Other Form 5005’s
ADOR 10313 (6/15)

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Financial
Go