Dnr Form 542-0465 - Change Of Sampling Site For Disinfection Byproducts

Download a blank fillable Dnr Form 542-0465 - Change Of Sampling Site For Disinfection Byproducts in PDF format just by clicking the "DOWNLOAD PDF" button.

Open the file in any PDF-viewing software. Adobe Reader or any alternative for Windows or MacOS are required to access and complete fillable content.

Complete Dnr Form 542-0465 - Change Of Sampling Site For Disinfection Byproducts with your personal data - all interactive fields are highlighted in places where you should type, access drop-down lists or select multiple-choice options.

Some fillable PDF-files have the option of saving the completed form that contains your own data for later use or sending it out straight away.

ADVERTISEMENT

Iowa Department of Natural Resources
Change of Sampling Site for Disinfection Byproducts
(TTHM and HAA5)
Note: The replacement site must meet the same targeting criteria as the original site. For example: If the original site was
a location where high levels of TTHM were expected, then the replacement site must also be a high TTHM location. If
only one site was used in the past, chose a replacement site with the highest levels of TTHM.
Typical Characteristics of Selected Sites
High TTHM sites are at the maximum residence time and are often located:
• hydraulically downstream of storage facilities and booster disinfection,
• in hydraulic dead-ends, where flow of water is low or stagnant, or
• near the ends of the distribution system, at or before the last group of customers.
High HAA5 sites are often located:
• in average residence time locations,
• after booster disinfection with chlorine, or
• low but detectable chlorine residual.
Sample sites should not be located:
• at a dead-end where there are no customers,
• before booster disinfection with chlorine,
• after the last hydrant or blow-off point, or
• in areas with significant biofilms or high heterotrophic bacteria plate count.
System Name:
PWSID: IA
Targeting criteria for the original site (circle one):
High TTHM
High HAA5
Reduced High TTHM and High HAA5
Sample Point ID: DB
(Note: The sample point ID from the original site will continue to be used for the new site.)
Original site address:
New site address:
Approximate distance between the two sites:
Reason for changing the site:
Name (print):
Title:
Signature:
Date:
Next step:
1. Keep this form with your current Stage 2 DBPR Sampling Plan.
2. Send a copy of the form to:
Iowa DNR – Water Supply Operations Section
th
502 E 9
St
Des Moines, IA 50319-0034
DNR Form 542-0465

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Legal
Go