Mussel Survey Scope Of Work Summary Sheet - 2016

ADVERTISEMENT

Mussel Survey Scope of Work Summary Sheet 2016
Form Date:
4/29/2016
Project Title:
Project Company:
Date Submitted:
Mussel Contractor:
Date Revised:
Lead Malacologist:
Project Contractor:
(if Mussel Contractor sub-contracting)
Divers: if applicable
lead diver that can provide QA/QC survey effort
County:
Group (Circle One): 1 2 3 4
Stream:
Location Description:
If Group 1 or 2, Receiving Stream:
NOTE: Watershed Area < 10sq mi US of ADI, no survey needed, unless Group 2 (1/2)
Project Type:
(corresponds to Table 3, WV Mussel Survey Protocol)
ADI Length:
ADI Width:
Salvage area:
US Buffer Length:
US Buffer Width:
US Buffer Length:
DS Buffer Length:
DS Buffer Width:
DS Buffer Length:
Lateral Buffer Length:
Lateral Buffer Width:
Lateral Buffer Width:
Phase 1 Survey Method: Transect
Cells
Other
2
# Transects/Length (m):
Cell Size (mxm):
Cell Search Effort (Min/m
)
2
Minimum search effort for cells is 0.2min/m
ADI:
2
USB:
if no mussels are found or 0.5min/m
if any
DSB:
mussels are found
Spacing Between Transects (M)
Coordinates (Decimal Degrees, NAD83)
Upstream End US Buffer:
Long.
Lat.
Upstream End ADI:
Long.
Lat.
ADI Center:
Long.
Lat.
Downstream End ADI:
Long.
Lat.
Downstream End DS Buffer:
Long.
Lat.
Map: Show ADI, USB, DSB and survey layout
Did you provide? Justification must be provided in scope of work
Addressed Alternative Methods
Yes
Provide Description in Scope
Addressed Alternative Sites
Yes
Provide Description in Scope
Phase 2 Methods (Group 2):
# Quadrats excavated
Be sure to define area on Map/Diagram
Salvage area only
Request for Relocation:
Yes
No
Method:
2
Cell Search Effort (Min/m
)
(check
Cell Size (mxm):
(minimum)
one)
Moving Transect:
Multiple passes are to be made through the area
until less than 5 % of the number collected on the
Other:__________________________
original pass are recovered on the final pass or

ADVERTISEMENT