Contract Fire Equipment - Incident Inspection Checklist - Type 2

ADVERTISEMENT

2
DATE: __________TIME:___________
EQUIPMENT KIND: WEED WASH, Type
CONTRACT FIRE EQUIPMENT - INCIDENT INSPECTION CHECKLIST
_________________________
______________________
___
_
FIRE NAME:
INCIDENT NUMBER:
RESOURCE #:
COMPANY/CONTRACTOR:__________________________________________________________________
CONTRACT / AGREEMENT NUMBER: ________________________________________________________
SERIAL or ID#:______________________________________________________________________________
OPERATOR NAME:
_______
______
_ _ __________________________________________________
_____
EQUIPMENT and OPERATOR REQUIREMENTS – WEED WASH, Type 2
#
Minimum Requirements
Pass Fail
(Not all inclusive, for additional items and clarification refer to contract – Section D)
---
---
---
---
-----
-----
D.8)
Two copies of complete Agreement/Contract: One for finance, one in vehicle (
1
Serial # or Company Equipment I.D. # on agreement and resource order, matches Serial
2
D.6.3.1)
D.6.4.1)
# or Company Equipment I.D. # on this Weed Wash unit (
(
D.6.5.1)
D.6.5.3)
Completed Check-In Process: Which also includes, Finance, and Plans (
(
3
Operators: 2 skilled operators present at all times during incident operational periods.
4
D.2.1.2_7)
(
Names of Operators: 1)_________________________2)____________________________
D.2.1_h)
Record: Daily record of all washed vehicles
(
5
D.2.1.2)
Self Contained unit with Non-Recycling water system
(
6
Solid Waste Containment Packages/Devices: Labeled and Secured, not to exceed 50 lbs
7
D.2.1.2_5)
D.2.1_g)
per package/device
(
(
8
Solid Waste is placed securely in easily transportable containment devices, and operator
D.2.1.2_5)
has received consultation from Ground Support or Resource Advisor
(
Ground Support or Resource Advisor: Name:____________________Title:___________
9
Power Washers: 2 each, hand-held, high pressure wands/nozzles, and spray covers
D.2.1.2_1)
100% of underbody surfaces
(
Wash Water Storage Tank: Adequate capacity to operate system for a minimum of 2
10
D.2.1.2_2)
consecutive hours.
(
11
Wash Time: Process time to wash a single fire engine shall not exceed 8 minutes (i.e. 7.5
D.2.1.2_6)
engines per hour)
(
D.2.1.2_9)
Wash System: Accommodates equipment up to 10 feet wide
(
12
Draining System: A 15 feet wide by 40 feet long piece of Amoco 4553, or equivalent
13
geotextile cloth with maximum size of 150 microns, installed on a pad of gravel or well
D.2.1.2_5)
drained surface. This mat is maintained and functional at all times (
14
All Solid Waste greater than 150 microns, including all geotextile cloth pieces are placed
D.2.1.2_5)
D.2.1_g)
in appropriate containment devices
(
(