Etme/emec499 Prototype Rollout Peer Evaluation Form

ADVERTISEMENT

ETME/EMEC499 Prototype Rollout
Peer Evaluation Form
PROTOTYPE ROLLOUT EVALUATION GUIDELINES:
This form is to be used as a guideline for written evaluation of the status of Capstone 2 project groups.
Project numbers are shown on the Capstone 2 project listing page. Evaluations to be submitted to the
appropriate drop box by close of business FRIDAY April 17th.
Evaluator
(Group Number/Name doing the evaluation):
Evaluation for
(Group Number/Name being evaluated):
Names of Group Members present in group being evaluated:
1. Completed Manufacturing Functional demonstration adequate.
_________pts
(10 pts max)
(Reason for deductions includes incomplete details or assembly, or insufficient demonstration.)
2. Documentation complete, correct, and on-hand for review.
__________pts
(10 pts max)
This Documentation should include the following
*Complete printed drawing set, INCLUDING any drawing updates/changes
*Level 1 Requirements (page from draft chapter is OK)
*Specifications (page from draft chapter is OK)
(Deductions possible if prototype doesn’t match drawings, Level 1 requirements, and/or specifications.)
TOTAL _________pts
.
Notes:

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business
Go