safe work method statement template
Page 1 of 4
Name of Contractor
responsible for compliance
Date:
with SWMS:
Company name:
Workplace location:
Cutting Hardwood or MDF
Completion of
Yes
N/A
(n/a should only be selected
Confined Space
High risk job description
when not working in a confined space)
Entry Permit?
Personal Protective Equipment (PPE) required to complete the job
Gloves
Face mask
Eye protection
Welding mask
Appropriate
Hearing protection
Protective clothing
footwear
What are the tasks involved?
What are the hazards and risks?
How will hazards and risks be controlled?
Describe the steps required to perform the
Against each step list the potential hazards that
List the control measure required to eliminate
task in the sequence they are carried out.
could cause injury/damage when the task step is
or minimise the risk of injury arising from the
performed.
identified hazard, see
Contractor Hazard
Identification and Control
Table.
Handling Hardwood or MDF sheets
Back injury from poor manual handling of Hardwood or
Team lifting when required.
MDF sheets.
Training in manual handling and use of mechanical
aids.
Get materials factory-cut to the correct sizes.
Cutting Hardwood or MDF
Fine wood dust causing irritation to eyes, lungs, skin.
For long term cutting set up a dedicated cutting
room with attention paid to dust extraction systems.
Central Office Use Only
Issue Date:
Last Reviewed:
Next Review Date:
No.
Authorised By:
THIS DOCUMENT IS UNCONTROLLED WHEN PRINTED
Central Office Use Only
Issue Date:
Last Reviewed:
Next Review Date:
No:
Authorised By: