REAP Attachments: Total Project Cost greater than $200,000
Attachments required in addition to those required for a “small” and “medium” application:
1. One line electrical diagram
2. Structural engineering drawings and calculations
3. If available, any permit applications submitted or permits received
4. If available, net metering agreement or other permissions from the utility that have been
secured
5. Financial Documents
a. Pro Forma of the proposed project
b. 3 years of balance sheets for the applicant (tax returns typically suffice)
c. 3 years of profit/loss statements for the applicant (tax returns typically suffice)
d. Recent balance sheet within 90 days of application
e. Recent profit/loss statement within 90 days of application
6. Feasibility study