Example Site Plan Review Checklists - Virginia Department Of Environmental Quality Page 4

ADVERTISEMENT

EXAMPLE Site Plan Review Checklists
3.0.
EXAMPLE CHECKLIST FOR A FINAL STORMWATER MANAGEMENT
SITE PLAN PREPARATION AND REVIEW
1. Applicant Information
Final Plan Submission Date
Project Name _________________________________________________________________
Site Plan/Permit Number
Site Address__________________________________________________________________
Applicant ________________________________________ Phone Number ______________
Applicant Legal Address ________________________________________________________
Owner __________________________________________ Phone Number ______________
Principal Designer _________________________________ Phone Number ______________
General Contractor
Phone Number
2. ______________ Signature and stamp of licensed professional consultant and owner
certification
3. Plan Status
_____ Approved
Legend:
- Complete
_____ Not Approved
Inc.
- Incomplete/Incorrect
N/A
- Not Applicable
4. ______ Common address and legal description of the site, including the tax reference
number(s) and parcel number(s) of the property or properties affected.
5. ______________ A narrative that includes a description of current site conditions and
proposed development and final site conditions, including proposed use of
environmental site design techniques and practices, stormwater control measures,
relevant information pertaining to long-term maintenance of these measures (see item
#12 below), and a construction schedule.
6. Existing and proposed mapping and plans (recommended scale of 1” = 50’, or greater
detail), which illustrates the following at a minimum:
______ North arrow
_______ Legend
______ Vicinity map
______ Existing and proposed topography (minimum of 2-foot contours recommended)
______ Property lines
_______ Perennial and intermittent streams
______ Mapping of predominant soils from USDA soils surveys as well as the location of any
site-specific test bore hole investigations that may have been conducted and information
identifying the hydrologic characteristics and structural properties of soils used in the
installation of stormwater management facilities
Boundaries of existing predominant vegetation and proposed limits of clearing and
grading

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Life
Go
Page of 6