Chief Engineer Resume Sample

ADVERTISEMENT

Address
Phone (111) 222-3333
Secaucus, NJ 12345
E-mail
Name
Summary
:
Responsible for leading teams in the maintenance, repair and operation of equipment installed in data
centers and commercial properties ranging up to 2.3M sq/ft of total facilities.
Experienced leader in the management of data centers and other critical facilities for corporations and
government organizations. Trained teams in the correct and rapid response to equipment casualties and
the importance of an effective preventative maintenance program.
Managed large budgets up to $150K per month for repairs and purchasing spare parts, and larger budgets
for facility construction, operation and equipment installation.
Possesses excellent customer service skills with the ability to convey engineering procedures and
equipment capabilities to managers and customers with little technical knowledge on how engineering
facilities equipment functions.
Certifications
Universal EPA 608 #0373313140500, NFPA 70E, OSHA 10/30, CPR/AED, and
:
TIG/Stick welding ability, Taking NJ Conditioned Air Exam Sep 2017
Professional Experience:
Facility Engineer, Big Data Center, Secaucus, NJ
2014 - Current
Managed the operations and maintenance of a 300,000+ sq/ft data center. Led the onsite team consisting
of; Building Systems Manager (Chief Engineer), Dispatcher and a crew of 10 Engineers.
Assisted in leading an electrical system upgrade project after a large circuit breaker failure event, this
involved the complete overhaul of the installed switch gear, major circuit breakers and electrical system
components to the data center.
Led the project to install “cold aisle containment” systems to improve energy efficiency.
Coordinated with outside vendors for specific maintenance and repair projects. Prepared statements of
work to provide guidance to vendors in successful project completion. Instituted procedures to inspect
completed projects for quality control purposes and inspected work sites daily to ensure work was
performed in accordance with applicable building codes.
Oversight of contractors responsible for the maintenance of the six 1,000-ton Trane chillers.
Conducted inspections of electrical panels to include loose and grounded breaker. Ensured that panel
schedule coincided with the field devices throughout the areas proposed for service.
Conducted inspections of the plumbing throughout the facilities to include sinks, water closets, urinals,
hot water heaters, domestic water pumps, fire pumps etc.
Participate in critical facility annual planning activities, input to annual financial plans for operating
expense and capital and development of ideas, monitoring and reporting of Cost Savings and Value-
Added Opportunities
Monitor routine assessments of electrical systems, operations and maintenance and establish guidelines
for processes and procedures to maintain the absolute objective of 100% Uptime.
Formulate, approve and implement preventative maintenance while collaborating with the project
management team to deliver on time completion of mission critical projects.
Facilitates management and training of onsite operating engineers, work order management, scheduling
and coordinating vendor services.
Extensive knowledge and hands-on experience in engineering and operational aspects of data
center/critical facilities including UPS Systems, PDU’s, emergency generators and static switches.
Maintain proficiency and strict adherence to Critical Awareness Process, Technical Bulletins with
established engineering guidelines, MOPs and SOPs.
Magellan Professional Solutions, Inc.

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business
Go