Tip re: analysis scope
• Usually do not need full base-case and
alternative-case energy/water/sewer costs
• Can typically focus on impacted increment,
sometimes reducing data requirements
• Example:
– Savings of project specified as base-case
consumption
– Alternative-case consumption specified as zero
14
Energy Exchange: Connect • Collaborate • Conserve