Form Boe-501-Hfp2 - Hazardous Waste Facility Fee Prepayment Form Second Prepayment Page 3

Download a blank fillable Form Boe-501-Hfp2 - Hazardous Waste Facility Fee Prepayment Form Second Prepayment in PDF format just by clicking the "DOWNLOAD PDF" button.

Open the file in any PDF-viewing software. Adobe Reader or any alternative for Windows or MacOS are required to access and complete fillable content.

Complete Form Boe-501-Hfp2 - Hazardous Waste Facility Fee Prepayment Form Second Prepayment with your personal data - all interactive fields are highlighted in places where you should type, access drop-down lists or select multiple-choice options.

Some fillable PDF-files have the option of saving the completed form that contains your own data for later use or sending it out straight away.

ADVERTISEMENT

BOE-501-HFP2 (S2) REV. 13 (4-13)
STATE OF CALIFORNIA
BOARD OF EQUALIZATION
DEFINITIONS FOR HAZARDOUS WASTE FACILITY FEE PREPAYMENT FORM
The following definitions apply to the facility's allowable capacity during any one month as stated in your permit, ISD,
or Federal Part A. If no capacity is stated, you must report based on your actual operations.
Lines 1
Disposal facility - A facility used for the disposal of hazardous waste.
thru 8.
Large onsite/offsite treatment facility - Treats, land treats, or recycles 1,000 or more tons of hazardous waste.
Onsite facility - A hazardous waste treatment facility at which hazardous waste is produced and which is
owned by, leased to, or under the control of the producer of the waste.
Offsite facility - A hazardous waste treatment facility that is not an onsite facility.
Small treatment facility - Treats, land treats, or recycles more than 0.5 tons (1,000 pounds), but less than 1,000
tons of hazardous waste.
Minitreatment facility - Treats, land treats, or recycles 0.5 tons (1,000 pounds) or less of hazardous waste.
Large storage facility - Stores 1,000 or more tons of hazardous waste.
Small storage facility - Stores more than 0.5 tons (1,000 pounds), but less than 1,000 tons of hazardous waste.
Ministorage facility - Stores 0.5 tons (1,000 pounds) or less of hazardous waste.
Line 9.
Series A Standardized Permit (Treatment) - Total influent volume of liquid hazardous waste treated is greater than
50,000 gallons per calendar month, or total volume of solid hazardous waste treated is greater than 100,000
pounds per calendar month, or any liquid or solid hazardous waste is stored for more than one calendar year.
Series A Standardized Permit (Storage) - Total facility storage design capacity is greater than 500,000 gallons of
liquid hazardous waste or greater than 500 tons solid hazardous waste, or any liquid or solid hazardous waste is
stored for more than one calendar year.
Series B Standardized Permit (Treatment) - Total influent volume of liquid hazardous waste treated is greater than
5,000 gallons but less than 50,000 gallons per calendar month, or total volume of solid hazardous waste treated is
greater than 10,000 pounds but less than 100,000 pounds per calendar month.
Series B Standardized Permit (Storage) - Total facility storage design capacity is greater than 50,000 gallons but
less than 500,000 gallons liquid hazardous waste or greater than 100,000 pounds but less than 500 tons solid
hazardous waste.
Series C Standardized Permit (Treatment) - Total influent volume of liquid hazardous waste treated does not
exceed 5,000 gallons per calendar month, or total volume of solid hazardous waste treated does not exceed
10,000 pounds per calendar month.
Series C Standardized Permit (Storage) - Total facility storage design capacity is less than 50,000 gallons liquid
hazardous waste or less than 100,000 pounds solid hazardous waste.
Series C Small Quantity (Treatment) - Total influent volume of liquid hazardous waste treated is less than 1,500
gallons per calendar month or total volume of solid hazardous waste treated is less than 3,000 pounds per
calendar month.
Series C Small Quantity (Storage) - Total facility storage design capacity is less than 15,000 gallons liquid
hazardous waste or less than 30,000 pounds solid hazardous waste.
(a)
Lines 10
Postclosure permit small facility - Manages 0.5 tons (1,000 pounds) or less of hazardous waste during any
and 11.
one month of the reporting period.
(b) Postclosure permit medium facility - Manages more than 0.5 (1,000 pounds), but less than 1,000 tons of
hazardous waste during any one month of the reporting period.
(c) Postclosure permit large facility - Manages 1,000 or more tons of hazardous waste during any one month of
the reporting period.

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Financial
Go
Page of 3