EVALUATING QUALITY OF BID CHECKLIST
Site Drawings Should Indicate:
❒
Overall dimensions and north arrow
❒
Adjoining streets and property lines
❒
Benchmarks and reference points
❒
Locations of existing and proposed work
❒
Existing and proposed contours
❒
Final grade elevations at all building corners and along building perimeters
❒
Walks, drives, or other surface features including slopes and cross slopes of accessible routes
❒
Locations and critical elevations of utilities, wells, disposal fields
❒
Parking facilities and storm drainage system
❒
Sanitary sewer, water supply and distribution, fire underground system; locations of fire hydrants
(existing and new)
❒
Coordination of utilities with the mechanical, electrical, and plumbing plans
❒
Flow lines and invert information on manholes
❒
Soil investigation data
Architectural Drawings Should Indicate:
Floor Plan
❒
Appropriate scale (1 /8 inch per foot or greater)
❒
"Key plan" to designate the project portion to which each sheet applies
❒
Dimensions, room titles, orientation north arrow, floor elevations
❒
Coordination with structural, mechanical, and electrical plans
❒
Supplementary drawings for congested areas, toilet rooms, equipment rooms, etc.
Roof Plan
❒
Same scale as floor plan
❒
Materials and system used
❒
Locations of valleys, ridges, cants, saddles, crickets, gutters, down spouts
❒
Projections through roof such as skylights, chimneys, exhaust ducts or vents, penthouses
❒
Changes in roof elevation, direction, and amount of slopes