Estimating Site Utilities Checklist Template

ADVERTISEMENT

Estimating Site Utilities Checklist
❒ Mobilization and demobilization (l/s)
❒ Surveying and as-builts (l/s)
Storm Drainage
❒ Excavation and backfill (cy)
❒ Manhole demolition (ea)
❒ Pipe demolition (lf)
❒ Manholes (ea), listing different types
❒ Catch basins (ea)
❒ Culverts (lf)
❒ Pipes (lf)—note different materials and dimensions (e.g., 18 or 30 inch RCP or PVC)
❒ Tie-ins (ea)
❒ Roof drain connection (ea)
❒ Foundation drain connection (ea)
❒ Sump pumps (ea)
Sanitary Sewer
❒ Excavation and backfill (cy)
❒ Open cut and repair (sy)
❒ Manholes (ea), listing different types
❒ Cleanouts (ea)
❒ Pipes (lf)—note different materials and dimensions (e.g., 4 inch versus 6 inch, DIP versus PVC)
❒ Septic tanks (ea)
❒ Grease traps (ea)
❒ Lift stations (ea)
Water
❒ Excavation and backfill (cy)
❒ Open cut and repair (sy)
❒ Pipes (lf)—note different materials and dimensions (e.g., 2 inch versus 3 ich, copper versus PVC)
❒ Fittings (ea), including tees, valves, etc.
❒ Backflow preventer (ea)
❒ Testing and balance (l/s)
Fire Underground
❒ Excavation and backfill (cy)
❒ Open cut and repair (sy)
❒ Pipes (lf)—note different materials and dimensions (e.g., 4 inch versus 6 inch, DIP versus PVC)
❒ Fittings (ea), including tees, valves, etc.
❒ Fire department connection (FDC) (ea)
❒ Fire hydrants (ea)

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Life
Go