Building Permit Application - Government Of Dubai

Download a blank fillable Building Permit Application - Government Of Dubai in PDF format just by clicking the "DOWNLOAD PDF" button.

Open the file in any PDF-viewing software. Adobe Reader or any alternative for Windows or MacOS are required to access and complete fillable content.

Complete Building Permit Application - Government Of Dubai with your personal data - all interactive fields are highlighted in places where you should type, access drop-down lists or select multiple-choice options.

Some fillable PDF-files have the option of saving the completed form that contains your own data for later use or sending it out straight away.

ADVERTISEMENT

BUILDING PERMIT APPLICATION
PLOT NUMBER
CONSULTANT
CONTRACTOR
SUBMISSION DETAILS
INITIAL SUBMISSION
RE-SUBMISSION
RENEWAL
RE-ISSUANCE
FAST TRACK
YES
NO
APPLICATION DETAILS ( PLEASE TICK [ √ ] THE PERMIT TYPE )
PRELIMINARY BUILDING PERMIT
( PLEASE TICK [ √ ] THE APPLICABLE
MOBILIZATION
EXCAVATION
SHORING
PILING
ACTIVITIES REQUESTED, AS SHOWN
RIGHT )
INTERIM BUILDING PERMIT
FOUNDATION
SUB-STRUCTURE
PODIUM
FINAL BUILDING PERMIT
NOTE:
PILING AND SHORING PERMIT SUBMISSION SHALL BE SUBMITTED SEPARATELY
DOCUMENTS REQUIRED – PRELIMINARY BUILDING PERMIT
1. APPOINTMENT LETTER BY THE OWNER TO CONSULTANT AND CONTRACTOR SIGNED BY OWNER AND
CONSULTANT(ORIGINAL ON LETTERHEAD)
2. COPY OF CONSULTANT’S AND CONTRACTOR’S PROFESSIONAL LICENSE
3. LAYOUT OF PROPOSED HOARDING (SOFT COPY AS PER CIRCULAR NO 229) INCLUDING COLOR,
MATERIAL ETC
4. UNDERTAKING LETTER (REFER TEMPLATE NO ZADC-T-63) (APPLICABLE FOR MOBILIZATION ONLY)
MOBILIZATION
5. LAYOUT OF SITE ALLOCATION WITH ADJACENT PLOT & SIGNBOARD DETAILS (SOFT COPY AS PER
CIRCULAR NO 229)
6. COPY OF PRELIMINARY DESIGN APPROVAL LETTER
7. SECURITY CHEQUE FROM CONTRACTOR (AS PER FEE MATRIX) OR PERFORMANCE GUARANTEE (REFER
TO TEMPLATE FORM NO. ZA-DC-T- 64)
8. APPLICABLE FEE (AS PER FEE MATRIX)
1. COPY OF MOBILIZATION PERMIT (LATEST) OR ALL DOCUMENTS MENTIONED IN THE MOBILIZATION
SECTION
2. CALCULATION FOR OPEN EXCAVATION (SLOPE STABILITY) AND DRAWINGS WITH CONSULTANT &
CONTRACTOR LOGO ON DRAWING (SOFT COPY AS PER CIRCULAR NO 229)
3. EXCAVATION DESIGN REVIEW CHECKLIST (REFER FORM NO. ZADC 107)
4. NOC FROM INFRASTRUCTURE AND RELEVANT AUTHORITY (IF EXCAVATION OUTSIDE PLOT LIMIT
(ROADSIDE)).
EXCAVATION
5. NOC FROM NEIGHBOR (IF EXCAVATION IN NEIGHBOR PLOT)
6. APPROVED SOIL REPORT BY CREATIVE CLUSTERS AUTHORITY (SOFT COPY)
7. NOC FROM COASTAL ZONE & WATERWAYS MANAGEMENT SECTION (AS PER DECREE # (22) 2001) [IF
APPLICABLE]
8. PEER REVIEW REPORT (4 BASEMENT AND MORE) (SOFT COPY)
9. COPY OF VALID PRELIMINARY DESIGN APPROVAL LETTER
10. APPROVAL OF LAND RE-DEMARCATION(REFER FORM NO: ZA-MP-F-11)
11. APPLICABLE FEE (AS PER FEE MATRIX)
1.
COPY OF MOBILIZATION PERMIT (LATEST) OR ALL DOCUMENTS MENTIONED IN THE MOBILIZATION
SECTION (IF APPLICABLE)
2.
APPROVED SOIL REPORT BY CREATIVE CLUSTERS AUTHORITY (SOFT COPY)
3.
COPY OF SPECIALIZED CONTRACTOR’S LICENSE REGISTERED IN DUBAI
4.
COPY OF VALID PRELIMINARY DESIGN APPROVAL LETTER
5.
DETAILED DESIGN CALCULATIONS & DRAWINGS (CONSULTANT & CONTRACTOR LOGO ON DRAWING) (SOF
SHORING
COPY AS PER CIRCULAR NO 229)
6.
NOC FROM COASTAL ZONE & WATERWAYS MANAGEMENT SECTION (AS PER DECREE # (22) 2001) [IF
APPLICABLE]
7.
NOC FROM INFRASTRUCTURE AND RELEVANT AUTHORITY (IF SHORING AND ANCHORS OUTSIDE THE
PLOT LIMIT (ROADSIDE)).
8.
SHORING DESIGN REVIEW CHECKLIST (REFER FORM NO.: ZA-DC-F- 77)
9.
NOC FROM NEIGHBOR (IF EXCAVATION OR ANCHORS IN NEIGHBOR PLOT)
10.
PEER REVIEW REPORT (4 BASEMENT AND MORE) (SOFT COPY)
ZA-DC-F-08 Issue 7, Rev 0, Dated 18/05/2016

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business
Go
Page of 2