New Construction For Commercial Buildings And Additions - City Of Dallas

Download a blank fillable New Construction For Commercial Buildings And Additions - City Of Dallas in PDF format just by clicking the "DOWNLOAD PDF" button.

Open the file in any PDF-viewing software. Adobe Reader or any alternative for Windows or MacOS are required to access and complete fillable content.

Complete New Construction For Commercial Buildings And Additions - City Of Dallas with your personal data - all interactive fields are highlighted in places where you should type, access drop-down lists or select multiple-choice options.

Some fillable PDF-files have the option of saving the completed form that contains your own data for later use or sending it out straight away.

ADVERTISEMENT

NEW CONSTRUCTION FOR COMMERCIAL
BUILDINGS AND ADDITIONS
APPLICATION CHECKLIST AND REQUIRED DOCUMENTS
By checking each requirement, you are stating that you have supplied correct and complete information. In the event that
the required information is not contained in the submitted documents, you will be notified of the deficiency. Failure to
supply the additional requested information within five (5) working days after notification may result in your application
being delayed and eventually discarded. A new application, the original application, complete plans and a new checklist
will be required for re-submittal for plan review. This re-submittal will be treated as a new application and will be
processed in the order of receipt. Complete the information sheet attached.
1. These plans comply with the Dallas Energy Conservation Code and the Green Building Ordinance (Ord. no.
27131).
Completed Commercial Green Building Program Plan Review Compliance Affidavit & Application
Checklist from a Registered Third Party Green Building Provider.
An Energy Code Certificate will be submitted to the electrical inspector prior to final inspection.
2. Have you submitted with your application, certified copies of any instrument that contains a restriction on the use
of or on construction on the affected property?
Yes
No, not applicable
3. An asbestos survey has been conducted in accordance with the Texas Asbestos Health Protection Rules and the
National Emission Standards for Hazardous Air Pollutants for the area being renovated and/or demolished.
Yes
Not applicable
No (Permit cannot be issued prior to notification of survey being conducted.)
Documented proof that plans and specifications were submitted to the Texas Department of Licensing and
4.
Regulation that comply with the Texas Accessibility Standards (TAS) by a Registered Accessibility Specialist
(independent contract provider) must be presented along with the building permit application.
Texas Department of Licensing and Regulation (TDLR) Project Number:
Completed permit and CO applications, site plan review form and commercial permit processing information
5.
sheet for each separate building on site.
Two (2) copies of information sheets to include:
6.
Detailed scope of work.
Total area in square feet of buildings with each building identified by occupancy or use.
Occupancy classification, if known.
Number of dwelling units (apartments) or guest rooms (hotel or motel).
Fire sprinkler status and intentions.
Parking requirements calculations.
Texas Department of Transportation (TXDOT) approval, if applicable.
7.
All drawing documents submitted for review must have a minimum text size of
/
” and a minimum drawing
3
32
sheet size of 11" x 17" and a maximum of 36” x 48”, “E” size.
8.
Two (2) copies of a site plan to include:
Drawn to a standard scale and fully dimensioned.
SUSTAINABLE DEVELOPMENT AND CONSTRUCTION DEPARTMENT
w BUILDING INSPECTION DIVISION
OAK CLIFF MUNICIPAL CENTER, 320 E. JEFFERSON BLVD., ROOM 118, DALLAS, TX 75203 w TEL. NO. (214) 948-4480