B Bid Division Description Bid Division

ADVERTISEMENT

HFHB BID DIVISION DESCRIPTION BID DIVISION HFH
10A: DRYWALL FINISHING
NEW CONSTRUCTION
EXCLUDED:
1. Hanging of drywall
2. Backing
3. Primer and Ceiling paint – Provided by HFHB
4. Orange Peel or Knock Down finishes
5. Painting walls
INCLUDED: Provide all labor, materials, equipment and site supervision to complete the
finishing of drywall as shown and specified, including but not limited to the technical
specification sections provided by architectural blueprints.
ALSO INCLUDED:
1. Taping of all drywall joints
2. Alternates pricing required. (See Alternates on Proposal Bid Form)
3. Corner bead installation with fasteners no less than 4” apart
4. Penetrations, fastener heads, surface defects and elsewhere as required to prepare
drywall for priming and paint finishes. (Assume 25% of electrical boxes will require
some repair).
5. Spray apply primer to all drywall surfaces (2 coats on walls and 1 coat on ceilings).
6. Apply 1 coat of ceiling paint on ceiling and in closets.
7. Coordination with other trades
8. All work to be performed in compliance with ASTM-C475
9. This project is managed by HFHB. All contractors on this project are considered prime
contractors. Coordination between trades and volunteers is to be considered part of this
work scope.
PRICING FORM:
Our Lump sum Base Bid for the work in Bid Division HFH – 10A is:
Per Three Bedroom Home
__________________________________________________Dollars ($___________)
Per Four Bedroom Home
__________________________________________________Dollars ($___________)
Name of Bidding Contractor:__________________________
Signed By:____________________________
Date:______________________________
Any questions concerning the requirements or work of this proposal may be directed by
mail to the address listed above or by e-mail to .

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business
Go
Page of 2