There are many important factors to consider in selecting a construction contractor in
addition to the most responsible bidder with the lowest cost estimate. Use this simple
worksheet in conjunction with the ABAG PLAN Contractor Self-Assessment contained in
the ABAG PLAN Risk Management Manual, to rank contractors based on the relative
importance of the criteria to each project.
5 = highest
1 = lowest
(Please circle only one number)
Selection Criteria
High
Low
1. The responsible contractor meets low
cost estimate requirements for public
entity contracting in California.
5
4
3
2
1
0
2. The contractor can demonstrate the
ability
to
meet
project-specific
conditions and requirements (capacity,
management
approach,
resources
/workload)
5
4
3
2
1
0
3. The contractor has a strong history of
performing to contract requirements
and meeting deadlines.
5
4
3
2
1
0
4. The contractor holds valid and proper
licenses.
5. The contractor is financially stable.
5
4
3
2
1
0
6. The contractor’s insurance limits meet
City requirements.
5
4
3
2
1
0
7. The contractor can provide a copy of
the IIPP (safety program).
5
4
3
2
1
0
8. The
contractor
can
identify
the
subcontractors to be used on the
project.
5
4
3
2
1
0
9. Contractors sign waivers of liability to
release the City from liability resulting
from their work.
5
4
3
2
1
0
Comments:
Average Rating:
Accepted
Rejected
Date:
Name/Titles of Evaluators:
1.