Excerpts From Draft M&v Plan Outline

ADVERTISEMENT

Excerpts from Draft M&V Plan Outline
3-18-04
1.
Executive Summary / M&V Overview
1.1
Annual Savings Overview
Etc…
ECM
Electric
Electric
Natural
Fuel Oil
Water
O&M
Annual
Total Annual
Energy
Demand
Gas
(gallons)
(gallons)
Cost
Energy Cost
Cost Savings
Savings
Savings
Savings
Savings
Savings ($)
($)
(kWh)
(kW)
(therms)
($)
Total
Savings:
Total Site
Usage*:
% Total
Site
Usage
Saved*:
*If available
2.4
O&M Reporting Requirements
2.4.1 Government Reporting Requirements
Summarize key verification activities and reporting responsibilities of government on
operations and maintenance items from details in ECM specific M&V Plans.
3.4
Operational & Maintenance Cost Savings
3.4.1 O&M Savings Justification
Describe how savings are generated
Detail cost savings calculations
3.4.2 Performance Period O&M Cost Adjustment factors, if used
3.5 Total Annual Savings For ECM
Electric
Electric
Natural
Fuel Oil
Water
O&M Cost
Annual
Total
Energy
Demand
Gas
(gallons)
(gallons)
Savings
Energy Cost
Annual Cost
(kWh)
(kW)
(therms)
Savings ($)
Savings
Baseline Use
M&V Plan Outline
page 1
November 12, 2003

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business
Go
Page of 4