Concern Checklist For New Construction And Renovations

ADVERTISEMENT

COLLEGE OF ST BENEDICT | ST JOHN’S UNIVERSITY
ENVIRONMENTAL HEALTH AND SAFETY
Concern checklist for new construction and renovations
The purpose of this checklist is to assist Campus Facilities (physical plant) staff in identifying
environmental health and safety concerns early in the planning process. Some of the checklist items are
for notification only, while others will require significant lead time to resolve (e.g. if a permit is required).
Circle Yes, No, or NA (Not Applicable) for each question. More explanation can be provided at the end
or on a separate attachment.
Please return completed forms to: Environmental Health & Safety Office.
Project Name
:
Project Number
Proposed Start Date:
:
GENERAL ISSUES
#
Issue
EHS
Contact
1.
Will construction disturb more than 1 acre?
Yes
No
NA
2.
Will the project cause removal of any underground petroleum
Yes
No
NA
storage tanks?
3.
Will any of the work be conducted in a flood plain?
Yes
No
NA
4.
Have storm water controls (e.g. silt fences, detention basins, etc)
Yes
No
NA
been included in the design?
5.
Will the project increase storm water runoff and/or impervious
Yes
No
NA
surface?
6.
Will the project require an addition or modification to the storm
Yes
No
NA
sewer system?
7.
Will there be a new underground petroleum storage tank?
Yes
No
NA
8.
Will there be a new above ground petroleum storage tank?
Yes
No
NA
9.
Will there be a new emergency generator?
Yes
No
NA
10.
Will there be any opening burning of vegetation or other items?
Yes
No
NA
NEW CONSTRUCTION
11.
Will there be a fossil fuel heating system >1M Btu/hr?
Yes
No
NA
12.
Will there be an incinerator?
Yes
No
NA
13.
Will there be a discharge to the sanitary sewer system other than
Yes
No
NA
from toilets and sanitary plumbing?
14.
Will a septic system, aerobic digester, or similar waste treatment
Yes
No
NA
system be installed?
15.
Are there any potential asbestos issues associated with connection
Yes
No
NA
to utilities?
16.
Are there any environmental issues due to previous uses of the
Yes
No
NA
site?
17.
Will there be a new elevator with hydraulic oil reservoir?
Yes
No
NA
PROJECTS INVOLVING RENOVATION AND/OR DEMOLITION
18.
Is there potential for asbestos disturbances with the project?
Yes
No
NA
19.
Is there potential for lead-based paint issue with the project?
Yes
No
NA
20.
Will oil-filled electrical equipment be removed (e.g. transformers,
Yes
No
NA
capacitors, hydraulic systems, power supplies, etc.)?
21.
Will the project require disposal of hazardous materials (e.g. lead
Yes
No
NA
paint, chemicals, oil, mercury, fluorescent lamp ballasts, etc.)?
22
Will project result in changed room numbers?
Yes
No
NA
Please return completed forms to: Environmental Health & Safety Office