Consolidated Emergency Response / Contingency Plan Template Page 4

Download a blank fillable Consolidated Emergency Response / Contingency Plan Template in PDF format just by clicking the "DOWNLOAD PDF" button.

Open the file in any PDF-viewing software. Adobe Reader or any alternative for Windows or MacOS are required to access and complete fillable content.

Complete Consolidated Emergency Response / Contingency Plan Template with your personal data - all interactive fields are highlighted in places where you should type, access drop-down lists or select multiple-choice options.

Some fillable PDF-files have the option of saving the completed form that contains your own data for later use or sending it out straight away.

ADVERTISEMENT

CERS Consolidated Emergency Response / Contingency Plan – Page 4 of 4
Rev. 06/27/11
H. EARTHQUAKE VULNERABILITY
Identify areas of the facility that are vulnerable to hazardous materials releases / spills due to earthquake-related motion. These areas require immediate isolation and
inspection.
H1.
VULNERABLE AREAS: (Check all that apply)
LOCATIONS (e.g., shop, outdoor shed, forensic lab)
1. HAZARDOUS MATERIALS / WASTE STORAGE AREA
H2.
2. PROCESS LINES / PIPING
H3.
H4.
3. LABORATORY
4. WASTE TREATMENT AREA
H5.
Identify mechanical systems vulnerable to releases / spills due to earthquake-related motion. These systems require immediate isolation and inspection.
H6.
VULNERABLE SYSTEMS: (Check all that apply)
LOCATIONS
1. SHELVES, CABINETS AND RACKS
H7.
2. TANKS (EMERGENCY SHUTOFF)
H8.
H9.
3. PORTABLE GAS CYLINDERS
4. EMERGENCY SHUTOFF AND/OR UTILITY VALVES
H10.
5. SPRINKLER SYSTEMS
H11.
6. STATIONARY PRESSURIZED CONTAINERS (e.g., Propane dispensing tank)
H12.
I. EMPLOYEE TRAINING
Explanation of Requirement: Employee training is required for all employees handling hazardous materials and hazardous wastes in day-to-day or clean-up operations
including volunteers and/or contractors. Training must be:
• Provided within 6 months for new hires;
• Amended as necessary prior to change in process or work assignment;
• Given upon modification to the Emergency Response / Contingency Plan, and updated/refreshed annually for all employees.
Required content includes all of the following:
• Material Safety Data Sheets;
• Communication and alarm systems;
• Hazard communication related to health and safety;
• Personal protective equipment;
• Methods for safe handling of hazardous substances;
• Use of emergency response equipment (e.g. Fire extinguishers, respirators,
• Fire hazards of materials / processes;
etc.);
• Decontamination procedures;
• Conditions likely to worsen emergencies;
• Evacuation procedures;
• Coordination of emergency response;
• Control and containment procedures;
• Notification procedures;
• UST monitoring system equipment and procedures (if applicable).
• Applicable laws and regulations;
INDICATE HOW EMPLOYEE TRAINING PROGRAM IS ADMINISTERED (Check all that apply)
I1.
1. FORMAL CLASSROOM;
2. VIDEOS;
3. SAFETY / TAILGATE MEETINGS;
4. STUDY GUIDES / MANUALS (Specify):
I2.
5. OTHER (Specify):
I3.
6. NOT APPLICABLE BECAUSE FACILITY HAS NO EMPLOYEES
Large Quantity Generator (LQG) Training Records: Large quantity hazardous waste generators (i.e., who generate more than 270 gallons/1,000 kilograms of
hazardous waste per month) must retain written documentation of employee hazardous waste management training sessions which includes:
• A written outline/agenda of the type and amount of both introductory and continuing training that will be given to persons filling each job position having
responsibility for the management of hazardous waste (e.g., labeling, manifesting, compliance with accumulation time limits, etc.).
• The name, job title, and date of training for each hazardous waste management training session given to an employee filling such a job position; and
• A written job description for each of the above job positions that describes job duties and the skills, education, or other qualifications required of personnel assigned
to the position.
• Current employee training records must be retained until closure of the facility.
• Former employee training records must be retained at least three years after termination of employment.
J. LIST OF ATTACHMENTS
(Check one of the following)
J1.
1. NO ATTACHMENTS ARE REQUIRED; or
J2.
2. THE FOLLOWING DOCUMENTS ARE ATTACHED:
K. SIGNATURE / CERTIFICATION
Certification: Based on my inquiry of those individuals responsible for obtaining the information, I certify under penalty of law that I have personally examined and
am familiar with the information submitted and believe the information is true, accurate, and complete, and that a copy is available on site.
SIGNATURE OF OWNER/OPERATOR
DATE SIGNED
K1.
NAME OF SIGNER (print)
K2.
TITLE OF SIGNER
K3.

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business
Go
Page of 4