Application For Permission To Carry Out Trench And Pit Excavation Within Railway Protection Zone

ADVERTISEMENT

RAPID TRANSIT SYSTEMS ACT (CHAPTER 263 A)
R
T
S
(R
P
, R
A
) R
APID
RANSIT
YSTEMS
AILWAY
ROTECTION
ESTRICTED
CTIVITIES
EGULATIONS
Application for Permission to Carry Out Trench and Pit Excavation
Within Railway Protection Zone
This form may take you 5 minutes to fill in.
You will need the following information to fill in the form:
(a) Project title and description of works
(b) Dates of commencement and completion works
(c) Location of works
(d) Name, address and contact/ fax no. of engineer-in-charge
(e) Name and contact no. of site supervisor
Explanatory notes:
(a)
Trench and pit excavations within the railway protection zone is a restricted activity in the
schedule of the Rapid Transit Systems (Railway Protection, Restricted Activities) Regulations;
These include:-
All trenches and pits which are within the railway protection zone of any part of
(i)
a railway which is below the ground; and
All trenches and pits which are within the railway protection zone of any part of a railway
(ii)
which is at grade or above the ground except those mentioned in paragraph 2 (b) below.
Application shall be made to the Land Transport Authority for permission to carry out these
activities using the prescribed form.
(b)
Permission from the Authority is not required for excavation of trenches and pits that are less than
2 meters deep and are located:-
(i)
At least 6 meters beyond the outermost edge of any part of MRT/LRT viaduct
structures, above ground MRT/LRT stations, above ground rapid transit system depot; or
(ii)
At least 6 meters clear of the fencing of railway which is at grade.
____________________________________________________________________________________
Please complete the application form and submit/ fax it with the following documents to:
Deputy Director
Development and Building Control Division
Land Transport Authority
251 North Bridge Road
Singapore 179102
Fax No: 63328223
1. Site plan (to scale)
2. Layout plan indicating location of proposed works with respect to the railway protection zone.
3. Plan and cross-sections (to scale) indicating :
(a) Trench dimensions & maximum excavation depth
(b) * Machine clearance below MRT/LRT viaduct
(c) * Temporary works details
(d) * Piling details
4. Method statement for proposed works
5. Certificates of machines and operators
6. Name, identity certificate and contact number of supervisor from Services Department
* Delete where not applicable
LTA DBC RAIL-S1 (Sep2005)
Page 1 of 2