Daily Progress Report Template Page 3

ADVERTISEMENT

4.
Water Quality Monitoring: Was water quality monitoring conducted today in compliance
with project permit requirements of the Louisiana Department of Natural Resources
Permit No. ____________________________ and water quality protection laws, and the
results provided to the Engineer (Yes/No)? ______________
5.
Verbal Instructions Received: (List any instructions given by the OWNER or
ENGINEER, construction deficiencies, retesting required, etc., with action to be taken.)
6.
Remarks: (Cover delays and any conflicts in Plans, specifications or instructions.)
7.
Safety Inspection: (Report violations noted; corrective instructions given; and corrective
actions taken.)
8.
Equipment Data: (Indicate items of construction equipment other than hand tools at job
site and whether or not used and if operable.)
9.
Dredge Status: (Is the dredge working, not operating due to weather/sea state, or is it
under repair?)
10.
Avoidance of Overdredging: Do you certify that the dredge has excavated within the
limits of the borrow areas, as shown in the Plans (Yes/No)? ___________. Also, do you
certify that the borrow area has not been excavated below the limit as shown in the Plans
(Yes/No)? __________