Footing And Foundation Checklist - Prince William County Department Of Development Services Page 2

Download a blank fillable Footing And Foundation Checklist - Prince William County Department Of Development Services in PDF format just by clicking the "DOWNLOAD PDF" button.

Open the file in any PDF-viewing software. Adobe Reader or any alternative for Windows or MacOS are required to access and complete fillable content.

Complete Footing And Foundation Checklist - Prince William County Department Of Development Services with your personal data - all interactive fields are highlighted in places where you should type, access drop-down lists or select multiple-choice options.

Some fillable PDF-files have the option of saving the completed form that contains your own data for later use or sending it out straight away.

ADVERTISEMENT

Virginia Uniform Statewide Building Code requires that each sheet of A, S, M, E, P drawings is signed and dated
by the designer licensed in Virginia responsible for the drawings (no photocopies will be accepted):
Architect’s or Engineer’s ORIGINAL professional seal, sign and date within the seal;
Contractors, as permitted by Section 54.1-402 of the Code of VA, list license number, occupation, name,
address,
phone number; ORIGINAL signature and date on each sheet.
Minimum paper size 24” x 30”
Minimum drawing scale 1/8” = 1’.
Current civil site plan as submitted to PWC Land Development Division showing all utilities; dimensioned
distances to public way, property lines and adjacent buildings; building height and area, use group/construction
type; fire walls; number of stories or mezzanine; finish floor elevation; exits.
ARCHITECTURAL
Code Analysis, Sheet #_______________________________________________________________________________
Listing of fire separation distances.
Use Group; Construction Type.
Building height; building square foot area.
Building height and area calculations with all allowable modifications.
Compliance with Mixed Occupancy requirements and design methods.
Whether or not the building is fire suppressed and supervised/monitored.
Fire rated construction:
Locate fire walls on architectural plans. Sheet # _____________________________________________________
Locate fire walls on civil drawings. Sheet # ________________________________________________________
STRUCTURAL
Note: All plans, technical reports and calculations shall bear the original seal, signature and date of the
Registered Design Professional in responsible charge.
General:
Provide current civil site plan as submitted to PWC Land Development Division. Sheet #____________________
Provide two copies of geotechnical reports.
Provide two sets of calculations.
Provide frame reactions for all pre-fabricated structures. The reactions shall be used for calculations.
Provide design loads, including ground snow, wind and seismic data, soil bearing value, soil lateral pressure
value. Sheet #_______________________________________________________________________________
Provide notes on structural materials used. Sheet #___________________________________________________
Provide means and methods of structural support of stairs, elevator and mechanical shafts.
Sheet #_____________________________________________________________________________________
Foundation:
Excavation sheeting and shoring plans. Sheet #_____________________________________________________
Provide foundation plans with cross sections, details, finished grade and depth of footings.
Sheet #_____________________________________________________________________________________
Provide anchor bolt details, embedment length, size and number. Sheet #_________________________________
Include all hairpin details where applicable. Sheet #__________________________________________________
Page 2 of 3
Footing and Foundation Checklist
Version 2014-10-26
Building Development Division. 5 County Complex Court, Prince William, VA, 22192. 703-792-6930.

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business
Go
Page of 3