Application For Encroachment Permit - Kentucky Transportation Cabinet Page 4

ADVERTISEMENT

TC 99‐1 (A)
 
Kentucky Transportation Cabinet 
1/2015
Department of Highways 
Page 4 of 4
 
Permits Branch 
 
 
APPLICATION FOR ENCROACHMENT PERMIT
 
16. Permittee, its successors and assigns, agree that if the Department determines it is necessary for the facilities 
or other encroachment authorized by the permit to be removed, relocated or reconstructed in connection with the 
reconstruction,  relocation  or  improvement  of  a  highway,  the  Department  may  revoke  permission  for  the 
encroachment  to  remain  under  the  permit  and  may  order  its  removal,  relocation  or  reconstruction  by  the 
permittee, its successors and assigns, at the expense of the permittee, except where the Department is required 
by law to pay any or all of those costs. 
17. Permittee agrees that the authorized permit is personal to the permittee and shall remain in effect until such 
time  as  (a)  the  permittee’s  rights  to  the  adjoining  real  property  to  have  benefitted  from  the  requested 
encroachment  have  been  relinquished,  (b)  until  all  permit  obligations  have  been  assumed  by  appropriate 
successors and assigns, and (c) unless and until a written release from permit obligations has been granted by the 
Department.  The  permit  and  its  requirements  shall  also  bind  the  real  property  to  have  benefitted  from  the 
requested encroachment to the extent permitted by law. The permit and the related encroachment become the 
responsibility  of  the  successors  and  assigns  of  the  permittee  and  the  successors  and  assigns  of  each  property 
owner  benefitting  from  the  encroachment,  or  the  encroachment  may  not  otherwise  permissibly  continue  to  be 
maintained on the right‐of‐way. (Does not apply to utility encroachments serving the general public.) 
18. If work authorized by the permit is within a highway construction project in the construction phase, it shall be 
the  responsibility  of  the  permittee  to  make  personal  contact  with  the  Department’s  Engineer  on  the  project  in 
order to coordinate all permitted work with the Department’s prime contractor on the project. 
19. This  permit  is  not  intended  to,  nor  shall  it,  affect,  alter  or  alleviate  any  requirement  imposed  upon  the 
permittee, its successors and assigns, by any other agency. 
20. Permittee, its successors and assigns, agree to contain and maintain all dirt, mud, and other debris emanating 
from the encroachment away from the surrounding right‐of‐way and the travel way of the highway hereafter and 
at all times that its obligations under the permit remain in effect. 
 
 
 

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Legal
Go
Page of 4