Application And Permit To Work Within County Right Of Way Form - Teton County Road And Bridge Department

ADVERTISEMENT

Permit No.______________________
APPLICATION AND PERMIT TO WORK WITHIN COUNTY RIGHT OF WAY
TETON COUNTY ROAD AND BRIDGE DEPARTMENT
Permittee __________________________________________Phone________________________________
Type or Print
Address
_______________________________________________________________________________
Street
PO Box
_______________________________________________________________________________
City
State
Zip
Road Name ____________________________________ Subdivision Name __________________________
Location (grid address must be correct) ________________________________________________________
Start Date ______________________________ Estimated Completion Date __________________________
Approach: ___Single residence
___ Subdivision
___Commercial
____ Agriculture
____Other
Type Of Work (Detailed Description)___________________________________________________________
_________________________________________________________________________________________
Excavation By _____________________________________________________________________________
Company Name
Contact
Phone
CULVERT REQUIRED: ___YES ___NO (To be determined by Teton County Road and Bridge Department)
CULVERT SIZE:___________________ (
Culvert size to be determined by the applicant, minimum culvert size is 18-inches)
If a culvert or bridge is installed over a canal, applicant must coordinate with the irrigation or canal company.
MAILBOX INSTALLATION: _____YES ____NO If a mailbox is installed at a location it must be on
a break away post at least 8' feet off the traveled roadway (in accordance with U.S. Postal regulations).
GENERAL REQUIREMENTS
1.
A fee is required and due with the permit application. The fee is $30.00 per approach or for right of way work
for a single residence, and $60.00 per approach or for right of way work for a Subdivision or Commercial use.
2.
The Local Highway Jurisdiction (LHJ) may change, amend or terminate this permit or any of the conditions herein
enumerated if permittee fails to comply with its provisions or requirements as set forth herein.
3.
Approaches shall be for the bona fide purpose of securing access and not for the purpose of parking, conducting
business, or servicing vehicles on the public right-of-way.
4.
No revisions or additions shall be made to an approach or it's appurtenances on the public right- of- way
without the written permission of the LHJ.
5.
The permit tee shall furnish all material, labor and equipment involved in the construction of the approach and it's
appurtenances. This shall include furnishing approved drainage pipe of a size specified on permit.
6.
The LHJ reserves the right to require the permittee, its successors and assigns, at any time, to make such
changes, additions, repairs and relocations to any approach or its appurtenances within the public right-of-
way as may be necessary to permit the relocation, reconstruction, widening, drainage, and maintenance of the
roadway and/or to provide proper protection to life and property on or adjacent to the roadway
7.
Approaches shall conform to the plans made a part of this permit. Adequate drawings or sketches shall be
included showing the design, materials, construction requirements and proposed location of the approach. All
approaches shall be in accordance with Exhibits 9 and 13 of the Manual for Use of Public Right-of-Way Standard
Approach Policy.
1

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Legal
Go
Page of 2