Confidence Test Report Form - Spray Booth - Seattle Fire Department Page 2

ADVERTISEMENT

This is a Federal Building 
This report form is designed to be attached to a fire suppression system report.
The items on the checklists below shall be inspected and tested.. Refer to the Seattle Fire Department
Fire Code for inspecting and testing requirements. 2009 SFC Chap. 9 and Sec.1504
Fire Protection System
Wet Sprinkler 
Chemical 
Clean Agent  Other 
T
F
P
S
YPE OF
IRE
ROTECTION
YSTEM
A
TTACH THIS REPORT TO THE FIRE PROTECTION SYSTEM
S CONFIDENCE TEST REPORT
P
-T
C
RE
EST
HECK
1. The Fire Alarm was put into test mode and/or other precautions were taken
N/A 
Yes 
No 
to avoid preventable alarms.
S
B
S
S
PRAY
OOTH
AFETY
YSTEMS
F
A
C
IRE
LARM
ONNECTION
N/A 
Yes 
No 
1. The fire alarm system trips upon activation of the fire protection system
F
P
S
I
:
IRE
ROTECTION
YSTEM
NTERLOCKS
2. All spraying equipment shuts down upon activation of the fire protection
Yes 
No 
system.(FPS)
N/A 
Yes 
No 
3. All drying equipment shuts down upon activation of the FPS
4. Where activation of the FPS requires ventilation, the exhaust equipment
N/A 
Yes 
No 
remains running.
5.
Where the FPS requires ventilation to be discontinued, the air makeup and
N/A 
Yes 
No 
exhaust systems shut down and dampers close.
6. The sprinkler heads or other FPS nozzles are properly protected against paint
Yes 
No 
buildup.
S
B
I
PRAY
OOTH
NTERLOCKS
Yes 
No 
7. The spray equipment will not operate unless the ventilation system is running
N/A 
Yes 
No 
8. The spray equipment will not operate when the drying system is in use.
9. The ventilation system operates for at least 3 minutes prior to rendering any
N/A 
Yes 
No 
drying equipment operable.
N/A 
Yes 
No 
10. All drying equipment shuts down if the ventilation system fails.
11. All drying equipment shuts down if the air temperature in the booth exceeds
N/A 
Yes 
No 
o
o
200
F (93
C).
Yes 
No 
V
F
& B
I
ENTILATION
ILTERS
OOTH
NTERIOR
Yes 
No 
12. The spray booth walls, ceiling, filters, and fan blades are free of paint build up.
13. The ventilation system provides an average velocity of 100 ft/min at a cross
Yes 
No 
section within the booth or across the open face of the booth.
Yes 
No 
14. The interior of the booth is free of deposits of overspray.
15. Glass panels or enclosures separating luminaries from the vapor area are
Yes 
No 
unbroken and sealed.
F
C
INAL
HECKS
16. The Fire Alarm was removed from test mode and/or other precautionary
N/A 
Yes 
No 
measures were removed to restore fire alarm system to normal operation
(includes removal of temporary protective coverings).
17. The system was left in service.
Yes 
No 
If “No”, why?
18. The a confidence test report was given to the owner and a current status tag
Yes 
No 
was posted.
Page 2 of 3
Spray Booth 9-2012 Ver.1.3