Mining Operations Apen - Form Apcd-222 Page 3

Download a blank fillable Mining Operations Apen - Form Apcd-222 in PDF format just by clicking the "DOWNLOAD PDF" button.

Open the file in any PDF-viewing software. Adobe Reader or any alternative for Windows or MacOS are required to access and complete fillable content.

Complete Mining Operations Apen - Form Apcd-222 with your personal data - all interactive fields are highlighted in places where you should type, access drop-down lists or select multiple-choice options.

Some fillable PDF-files have the option of saving the completed form that contains your own data for later use or sending it out straight away.

ADVERTISEMENT

Permit Number:
AIRS ID Number:
/
/
[Leave blank unless APCD has already assigned a permit # and AIRS ID]
Section 4 – Processing/Manufacturing Information & Material Use
Check this box if APEN is for Haul Roads only (not located at a mining site) and complete the applicable sections,
Section 4H – Raw Material Transport and/or Section 4I – Finished Product Transport on pages 6 and 7. Otherwise
complete all of Section 4.
From what year is the actual annual amount?
Actual Annual Production
(tons)
4
Requested Annual Production
(tons)
4
Requested values will become permit limitations. Requested limit(s) should consider future process growth.
Section 4A – Topsoil
Removal
Stockpile(s)
Topsoil removed daily
Maximum stored on site
(tons)
(tons)
Topsoil removed annual
Proposed controls for topsoil stockpile
(tons)
Proposed controls for topsoil removal
Watering
Moist Material
Chemical Stabilizer
Water Spray
Compacting of Piles
Other
Enclosures
(specify)
(choose one option from below)
Complete
Partial
Revegetation
(must occur within one year of site disturbance)
Other
(specify)
Section 4B – Overburden
Removal
Stockpile(s)
Equipment used for removal
Maximum stored on site
(tons)
Tons removed by dragline
Proposed controls for overburden stockpile
(daily)
Tons removed by dragline
Watering
(annual)
Dragline drop height
Chemical stabilizer
(feet)
Hours scraper operated
Compacting of piles
(daily)
Hours scraper operated
Enclosures
(annual)
(choose one option from below)
Proposed controls for overburden removal
Complete
Partial
Moist material
Revegetation
(must occur within one year of site disturbance)
Water Spray
Other
(specify)
Other
(specify)
Form APCD-222 – Mining Operations APEN - Revision 4/2016
3 |

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Legal
Go
Page of 9