State Of Kansas Division Of Environment Application For Sewer Extension Permit Page 2

ADVERTISEMENT

DESIGN ENGINEER DATA
1.
_____________________________________________________________________
Name of Project (as it appears on plans)
2.
Engineers estimate of construction cost _____________________________
3.
What are the conditions and capacity of the existing sewer system
downstream of this sewer extension?
a.
What is the present average daily
flow at the wastewater treatment facility?
_________________MGD
CIRCLE YES OR NO
b.
Do the downstream sewer lines presently
convey the peak flow without inducing backup
into buildings or bypass to the environment?
YES
NO
c.
Can the downstream receiving sewers convey the
additional peak design flow generated after
completion of this sewer extension without
backup into buildings or bypassing to the
environment?
YES
NO
d.
If the answer to either of the above questions is NO, what steps
are being taken to eliminate or prevent bypass or service line
backup conditions?
________________________________________________________________
________________________________________________________________
___________________________Attach additional pages if necessary.
4.
What are the design flows for this sewer extension?
(Include a copy of the calculations for flow and list the following
values)
Average daily _________________MGD
Peak____________________MGD
5.
If wastewater pumping facilities are included in the project, provide
with this application the following: system curve, pump curve and total
head calculations and planned control elevations i.e. pumps off, low
level on, high level on, and alarm level.
The information contained above is accurate to the best of my knowledge.
Signature:
_________________________
Kansas Licensed Engineer
Print Name: _________________________
Address: _________________________
_________________________
_________________________
P.E. Stamp/Date/Signature

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Legal
Go
Page of 2