Tdlr Form Ab05 10-08 - Architectural Barriers Project Registration Form Page 2

Download a blank fillable Tdlr Form Ab05 10-08 - Architectural Barriers Project Registration Form in PDF format just by clicking the "DOWNLOAD PDF" button.

Open the file in any PDF-viewing software. Adobe Reader or any alternative for Windows or MacOS are required to access and complete fillable content.

Complete Tdlr Form Ab05 10-08 - Architectural Barriers Project Registration Form with your personal data - all interactive fields are highlighted in places where you should type, access drop-down lists or select multiple-choice options.

Some fillable PDF-files have the option of saving the completed form that contains your own data for later use or sending it out straight away.

ADVERTISEMENT

INSTRUCTIONS FOR COMPLETING A PROJECT REGISTRATION FORM – AB 005
1. Person Registering Project Name – Enter the name of the person completing the form
2. Address – Enter the mailing address and suite number (if applicable) of the person named in #1
3. Phone – Enter the phone number and email address (optional) of the person named in #1
4. Project Name – Enter the name of the project (examples: CLASSROOM ADDITION, TENANT FINISH OUT FOR DR. SMITH)
5. Building / Facility Name – If this project is located in a building or facility with a name, enter the name (examples: the “CLASSROOM ADDITION”
is located in the building or facility named “WASHINGTON HIGH SCHOOL”; the “TENANT FINISH OUT FOR DR. SMITH” is located in the office
building named “MEDICAL PLAZA II”)
6. Project Address – Enter the physical address (if available) and the suite number (if applicable) of the project. Post Office Box numbers are not
acceptable.
7. Tenant Contact Name – Enter the name and phone number for the contact person or persons, company, corporation, authority, commission,
board, governmental entity, institution or any other unit that will occupy the project space.
8. Building or Facility Owner – Enter the name and phone number of the person or entity (company, corporation, authority, commission, board,
governmental entity, institution or any other unit) that holds title to the property.
9. Owner Address – Enter the mailing address and the suite number (if applicable) of the facility owner named in #9.
10. Contact Name – If there is a contact person other than the facility owner (as listed in #9), enter the name and phone number of the person
representing the owner
11. Contact Address – Enter the mailing address and the suite number (if applicable) of the person named in #11 if other than the owner.
12. Contact Phone – Enter the phone number and email address (optional) of the person named in #11 if other than the owner
13. Design Firm – Enter the name and phone number of the design firm or company responsible for the design of the project.
14. Firm Address – Enter the mailing address and the suite number (if applicable) of the firm named in #14.
15. Designer Name – Enter the name of the architect, engineer, interior designer, or landscape architect with overall responsibility for the design of the
project and whose seal is affixed to the drawings and enter their e-mail address.
16. Type of License – Check the box for the applicable license type of the designer and enter the license number (if applicable). If no design
professional, check the box for “other”.
17. Start Date – Enter the date construction is scheduled to begin (month and year).
18. Completion Date – Enter the date construction is scheduled to be completed (month and year).
19. Estimated Cost – Enter the estimated cost of construction. Cost should not include site acquisition, furnishings, or equipment that is not part of the
building mechanical systems.
20. Type of Work – Check the box for the applicable type of work.
21. Type of Funds – Check the box for the applicable method of funding.
22. State Lease No. (if applicable) – Enter the state lease number if the construction project is for purposes of a state agency lease contract and/or
occupancy by a state agency.
23. Does this building(s) have more than one level? – Check yes or no
Text
24. Are there any elevators, escalators, or platform lifts in this building? – Check yes or no
25. Does this building(s) have any boilers? – Check yes or no
WHAT TO SUBMIT
26. Scope of Work - Enter a detailed description of the construction activities.
1.
One complete set of construction documents (plans and
specifications) for all disciplines. All documents applicable to the
TDLR FEE SCHEDULE
project should be submitted as one package.
The following fees are applicable only to services performed by TDLR.
(Note: If services will be performed by a RAS, please contact the RAS for fee
2.
A completed Architectural Barriers Project Registration Form or
information as they set and collect their own fees.)
AB Project Registration Confirmation page for each site/address
or State Lease Registration Form (if applicable).
Estimated Construction Cost
Plan Review Fee
TDLR Project
Inspection Fee
Filing Fee
3.
If the review and/or inspection will be performed by TDLR,
submit a check or money order payable to "Texas Department
$175
50,000 - 200,000
$250
$350
of Licensing and Regulation" at P.O. Box 12157, Austin, Texas
$175
200,001 - 500,000
78711.
$375
$315
$380
$175
$400
500,001 - 1,000,000
4.
When construction documents are submitted after completion of
construction, the late submittal Project Filing fee shall apply.
1,000,001 - 5,000,000
$445
$175
$445
5.
An architect, interior designer, landscape architect, or engineer
5,000,001 - 10,000,000
$575
$175
$575
with overall responsibility for the design of a building or facility
subject to §469.101 of the Act, shall mail, ship, or hand-deliver
$620
$175
$620
10,000,001 - 15,000,000
the construction documents along with a Proof of Submission
form to the department, a registered accessibility specialist, or a
$175
$785
15,000,001 - 25,000,000
$785
contract provider not later than the fifth day after the plans and
specifications are issued. In computing time under this
25,000,001 - 50,000,000
$955
$175
$955
subsection, a Saturday, Sunday or legal holiday is not included.
,
50,000,001 - 75,000,000
$1175
$175
$1175
6.
In instances when there is not a design professional with overall
> 75,000,000
Contact TDLR
$175
Contact TDLR
responsibility, the owner of a building or facility subject to
§469.101 of the Act, shall mail, ship, or hand-deliver
Late Project Filing Fee
$300
construction documents to the department, a registered
accessibility specialist, or a contract provider prior to filing an
Preliminary Review Fee
$145 each
application for building construction permit or commencement of
construction.
State Lease Inspection (No Construction)
$225 per lease
7.
An Elimination of Architectural Barriers Project Registration form
Special Inspection Fee
$215 per hour, one hour minimum
or Architectural Barriers Project Registration Confirmation Page
must be completed for each subject building or facility and
Variance Application Fee
$175 each
submitted along with the applicable fees when the design
professional or owner submits the construction documents. (One
Variance Appeal Fee
$200 each
complete set of construction documents (plans and
specifications) for all disciplines). All documents applicable to
Example: Estimated construction cost is $250,000; submit the project filing fee of $175.00 and
the project should be submitted as one package.
the review fee of $315.00 for a total of $490.00. The inspection fee would be $375.00.
NOTE: All fees are non-refundable

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Legal
Go
Page of 2