Mineral Exploration Progress Report Page 2

ADVERTISEMENT

DRILL HOLE SUMMARY REPORT
Permit #:
E/_____/________
Project Name:______________________
Complete this Portion Only if Water Encountered
All Dry Drill Holes are plugged with a 5 foot cement plug
Fill out Page 2 if water is encountered for EACH wet hole
Pre
Final
NAD 27 GPS
Depth
Total
Date
Flow
Date
NOTES
Drill
Drill
to
Depth
Drilled
Rate
Plugged
(Describe how plugged, Artesian, etc)
Hole
Hole
Northing
Easting
(Feet)
(mm/dd/yyyy)
Water
(GPM)
No.
No.
A Registered Professional Geologist in the State of Utah or a Certified Professional Geologist with the
AIPG or an officer of the company registered to do business in the State of Utah must sign this form if the form
is being used to request release.
I certify that the reported information, statements, and/or documentation on this form are true and
correct to the best of my knowledge and belief.
STAMP
Name ________________________Title________________ PG or CPG License No.__________
Signature ___________________________________________ Date ________________

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business
Go
Page of 3