Site Plan Review Checklist

ADVERTISEMENT

SITE PLAN REVIEW CHECKLIST
Development:
Submittal Date:
Address:
Checked By:
General
Eight sets of plans shall be submitted
Plans should be in AutoCAD format
Minimum sheet size shall be 24” x 36” unless otherwise approved prior to submission
Set shall be comprised of separate sheets as listed below unless otherwise approved by the Site Plan
Review Committee at the pre-application scoping session
All plans shall be stamped by Commonwealth of Massachusetts-registered Professional Engineer,
Professional Land Surveyor, and/or Professional Landscape Architect
All plans oriented so that north arrow points to top of sheet
All plans shall be shown at 1” = 40’ or less and shall show a graphical scale
All plans shall have a title block comprised of the following:
o Project Title
o Sheet Title
o Sheet Number
o Registrant Stamp (PE, PLS, LA)
o Engineers name, address
o Scale
o Plan Issue Date
o Plan Revision Date(s)
Traffic Impact and Access Study (TIAS) to be submitted with application
Storm Water Management Report to be submitted with application
Cover Sheet
Title Block
o Project name / title
o Street number and/or lot number (for new buildings, engineering will assign a street number prior
to approval)
o Assessor’s map and parcel number(s)
o Name and address of property owner
o Name and address of engineer
o Name and address of developer
o Name and address of architect
o Name and address of landscape architect
o Revision Date Block
Zoning District
Zoning Requirements Table-“Required vs. Provided”
o Lot Size
o Lot Frontage
o Side Yard Setback
o Front Yard Setback
o Rear Yard Setback
o Building Height
o Lot Coverage
o Distance from Residential District
o Parking Spaces
Compact Parking Spaces
C:DOCUME~1PETERC~1LOCALS~1TempfcctempSite Plan Review Checklist.doc
Page

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Life
Go
Page of 5