Feasibility Cost Estimate (Fce)

ADVERTISEMENT

[Company Name]
downloaded from:
[Project Name]
Project
Feasibility Cost Estimate (FCE)
[Project Phase]
Phase
[Client]
[Project Mngr.]
01/01/2016
Client
Proj. Mngr.
Date
[Client's Representative]
Client's Repres.
[Contractor]
Contractor
FCE No.
[Sub-Contractor]
Sub-Contractor
Consultancy
QTY
Rate
Line Total
1
A)
Architect
10.00
1,000.00
10,000.00
Civil/Structural Engineer
20.00
2,000.00
40,000.00
B)
C)
Cost Control
30.00
3,000.00
90,000.00
Planning Engineer
40.00
4,000.00
160,000.00
D)
Health and Safety
50.00
5,000.00
250,000.00
E)
Site Supervision
60.00
6,000.00
360,000.00
F)
Project Management
70.00
7,000.00
490,000.00
G)
Other
80.00
8,000.00
640,000.00
H)
Sub-Total Construction Cost
2,040,000.00
Survey, Planning, Permits
QTY
Rate
Line Total
2
Site Investigation
10.00
1,000.00
10,000.00
A)
B)
Topographical Survey
20.00
2,000.00
40,000.00
Environmental Survey
30.00
3,000.00
90,000.00
C)
D)
Planning & Warrant Fees
40.00
4,000.00
160,000.00
Building Permits
50.00
5,000.00
250,000.00
E)
F)
Other
60.00
6,000.00
360,000.00
Sub-Total Construction Cost
910,000.00
Construction Cost
QTY
Rate
Line Total
3
Preliminaries
-
A)
Enabling
-
B)
Preliminaries
-
1
Demolition
-
2
Site Clearing
-
3
Landscaping/Levelling
-
4
5
Site Fencing
-
Site Facilities
-
6
7
De-Watering
-
Others
-
8
Infrastructure
-
C)
Energy
-
1
Water
-
2
Waste Water
-
3
Site Levelling
-
4
Communication
-
5
Others
-
6
D)
Construction Works
-
Foundation (incl. Piling etc.)
-
1
2
Sub-structure
-
Super-structure
-
3
4
MEP
-
HVAC
-
5
Others
-
6
Ancillary Buildings
-
E)
1 Plant rooms
-
Marc Arnecke, PMP