General Contractor'S Roofing Guarantee Page 2

ADVERTISEMENT

ABC Form C-9
August 2001
A. Specifically excluded from this Guarantee are damages to the work, other parts of the
building and building contents caused by: (1) lightning, windstorm, hailstorm and other
unusual phenomena of the elements; and (2) fire. When the work has been damaged by
any of the foregoing causes, the Guarantee shall be null and void until such damage has
been repaired by the General Contractor, and until the cost and expense thereof has been
paid by the Owner or by the responsible party so designated.
B. During the Guarantee Period, if the Owner allows alteration of the work by anyone other
than the General Contractor, including cutting, patching and maintenance in connection
with penetrations, and positioning of anything on the roof, this Guarantee shall become
null and void upon the date of said alterations. If the owner engages the General
Contractor to perform said alterations, the Guarantee shall not become null and void,
unless the General Contractor, prior to proceeding with the said work, shall have notified
the Owner in writing, showing reasonable cause for claim that said alterations would
likely damage or deteriorate the work, thereby reasonably justifying a termination of this
Guarantee.
C. Future building additions will not void this guarantee, except for that portion of the future
addition that might affect the work under this contract at the point of connection of the
roof areas, and any damage caused by such addition. If this contract is for roofing of an
addition to an existing building, then this guarantee covers the work involved at the point
of connection with the existing roof.
D. During the Guarantee period, if the original use of the roof is changed and it becomes
used for, but was not originally specified for, a promenade, work deck, spray cooled
surface, flooded basin, or other use of service more severe than originally specified, this
Guarantee shall become null and void upon the date of said change.
E. The Owner shall promptly notify the General Contractor of observed, known or
suspected leaks, defects or deterioration, and shall afford reasonable opportunity for the
General Contractor to inspect the work, and to examine the evidence of such leaks,
defects or deterioration.
IN WITNESS THEREOF, this instrument has been duly executed this ___________ day of
__________________, 20 _____.
__________________________________________
General Contractor’s Authorized Signature
__________________________________________
Typed Name and Title
Page 2 of 2

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business
Go
Page of 2