National Pollutant Discharge Elimination System (Npdes) Stormwater Notice Of Termination Form - Florida Department Page 3

Download a blank fillable National Pollutant Discharge Elimination System (Npdes) Stormwater Notice Of Termination Form - Florida Department in PDF format just by clicking the "DOWNLOAD PDF" button.

Open the file in any PDF-viewing software. Adobe Reader or any alternative for Windows or MacOS are required to access and complete fillable content.

Complete National Pollutant Discharge Elimination System (Npdes) Stormwater Notice Of Termination Form - Florida Department with your personal data - all interactive fields are highlighted in places where you should type, access drop-down lists or select multiple-choice options.

Some fillable PDF-files have the option of saving the completed form that contains your own data for later use or sending it out straight away.

ADVERTISEMENT

INSTRUCTIONS – DEP FORM 62-621.300(6)
NPDES STORMWATER NOTICE OF TERMINATION (NOT)
Who May File an NOT:
Permittees who presently are covered under the Generic Permit for Stormwater Discharge from Large and Small Construction
Activities provided in subsection 62-621.300(4), F.A.C., the Multi-Sector Generic Permit for Stormwater Discharge Associated with
Industrial Activity provided in subsection 62-621.300(5), F.A.C. or the conditional exclusion for “no exposure” of industrial activities
and materials to stormwater provided in paragraph 62-620.100(2)(o), F.A.C. shall submit a Notice of Termination (NOT) when their
facility or project no longer has any stormwater discharges associated with industrial activity as defined in Rule 62-620.200 F.A.C.;
stormwater discharge associated with construction activity as defined in DEP Document 62-621.300(4)(a); no longer meets the
condition of “no exposure” defined in paragraph 62-620.100(2)(o), F.A.C.; or when they are no longer the operator of the facility or
project.
For construction activities, elimination of all stormwater discharges associated with industrial activity occurs when disturbed soils at
the construction site have been finally stabilized and temporary erosion and sediment control measures have been removed or will be
removed at an appropriate time, and all stormwater discharges associated with construction activity from the construction site that are
authorized under the generic permit have been eliminated. Final stabilization means that all soil-disturbing activities at the site have
been completed and that a uniform (e.g., evenly distributed, without large bare areas) perennial vegetative cover with a density of at
least 70% for all unpaved areas and areas not covered by permanent structures has been established, or equivalent permanent
stabilization measures (e.g., geotextiles) have been employed.
Where to File an NOT:
The Department encourages the electronic submission of NOTs through the NPDES Stormwater Program’s electronic
permitting application, available at As an alternative, NOTs may be submitted by paper copy to
the following address:
NPDES Stormwater Notices Center, MS #3585
Florida Department of Environmental Protection
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Permit Fee:
There is no application fee for submitting a NOT.
Additional Notification:
If stormwater associated with industrial or construction activity discharged to a Municipal Separate Storm Sewer System (MS4), a
copy of the completed NOT shall be provided to the operator of the MS4.
For construction activities, if other contractors/subcontractors are covered under the permittee’s Notice of Intent (NOI) and/or
Stormwater Pollution Prevention Plan (SWPPP), a copy of the completed NOT shall be provided to each additional
contractor/subcontractor known to the permittee to be covered or claiming coverage under the permittee’s NOI and/or SWPPP.
Contractors/subcontractors claiming coverage under a permittee’s NOI must assure proper permit coverage for the duration of their
regulated activity. Failure of the permittee to provide a copy of the NOT as provided herein shall not relieve the
contractor/subcontractor relying upon the permittee’s NOI from the required permit coverage or any potential enforcement action
arising from the regulated activity.
Part I – Termination Information:
Item A.: Enter the DEP Facility ID/Project Number for the facility/project.
Item B.: Indicate the reason for termination of coverage by check the appropriate box.
Part II – Operator Information:
Item A.: Provide the legal name of the entity (operator) to which coverage was granted.
Items B. – E.: Provide the complete mailing address of the operator, including city, state and zip code.
Items F. – G.: Provide the name and telephone number (including area code) of the person authorized to submit this NOT on behalf of
the operator. This must be the same person as indicated in the certification in Part IV.
Page 3 of 4
DEP Form 62-621.300(6)
Effective Date: 02/2015