Dd Form 1494 Application For Equipment Frequency Allocation Page 2

Download a blank fillable Dd Form 1494 Application For Equipment Frequency Allocation in PDF format just by clicking the "DOWNLOAD PDF" button.

Open the file in any PDF-viewing software. Adobe Reader or any alternative for Windows or MacOS are required to access and complete fillable content.

Complete Dd Form 1494 Application For Equipment Frequency Allocation with your personal data - all interactive fields are highlighted in places where you should type, access drop-down lists or select multiple-choice options.

Some fillable PDF-files have the option of saving the completed form that contains your own data for later use or sending it out straight away.

ADVERTISEMENT

INSTRUCTIONS FOR COMPLETING DD FORM 1494,
"APPLICATION FOR EQUIPMENT FREQUENCY ALLOCATION"
NTIA GENERAL INFORMATION PAGE
ITEM 8 - Target Date. For the stage review requested,
ITEM 1 - Application Title. Enter the Government
enter the appropriate dates. Funds must not be
nomenclature of the equipment, or the manufacturer’s
obligated prior to the approval of this application. If
name and model number, and a short descriptive title.
foreign coordination is not required, then approximately
one year must be allowed for application approval. If
ITEM 2 - System Nomenclature. Enter the nomenclature
foreign coordination is required, approximately two
of the system for which this equipment is a subsystem,
years must be allowed for application approval.
e.g., PATRIOT or Global Positioning System.
ITEM 9 - System Relationship and Essentiality.
ITEM 3 - Stage of Allocation. Mark appropriate block.
Enter the essentiality and a statement of the relationship
between the proposed system and the operational
ITEM 4 - Frequency Requirements.
function it is intended to support.
ITEM 10 - Replacement Information. Identify existing
a. Enter the required frequency bands. For equipment
system(s) which may be replaced by the proposed
designed to operate only at a single frequency, enter this
system. State any known additional frequency
frequency. Indicate units, e.g., kHz, MHz, or GHz.
requirements.
b. Enter the emission designators including the necessary
ITEM 11 - Related Analysis and/or Test Data. Identify
bandwidth for each designator, as described in Chapter 9
reports that can be made available documenting
of the NTIA Manual e.g., 40M0PON.
previous EMC studies, predictions, analyses, or
prototype EMC testing that are relevant to the
Enter in Item 18, "Remarks," any other information
assessment of the system under review.
pertinent to frequency requirements, such as minimum
frequency separation for full duplex links or repeaters; or
ITEM 12 - Number of Units. (For mobile systems) -
Self explanatory.
special relationships involving multiple discrete
frequencies.
ITEM 13 - Geographical Area. Enter geographical
location(s) or area(s) of use for this and subsequent
ITEM 5 - Purpose of System, Operational and System
stage(s), e.g., Gilfillan Plant, Los Angeles, California,
Concepts. Enter a summary description of the function of
and White Sands Missile Range, New Mexico (Stage 2);
the system or subsystem, e.g., collect and disseminate
US&P (Stage 3); US&P, NATO Countries and Korea
meteorological data using satellite techniques;
(Stage 4). Provide geographical coordinates (degrees,
transmission of radar data for air traffic control; a remote
minutes, seconds) if available.
control of ATC radars; provide for the transmission and
reception of digital voice and data by means of LOS or
ITEM 14 - Line Diagram. Enter the page number of the
tropo modes of propagation; provide navigational signal
line diagram(s). Attach as another page the line
diagram showing the links, direction of transmis- sions,
from which a broad spectrum of users are able to derive
frequency band(s), and associated equipment with J/F
navigation data. Also include information on operational
12 numbers.
and system concepts. Mark whether the system has a
wartime function.
ITEM 15 - Space Systems. Enter the page number of
the space system data. Attach as another page the
ITEM 6 - Information Transfer Requirements. Enter the
space system data as described in the NTIA Manual,
required character rate, data rates, circuit quality, reliability,
Paragraph 8.3.7. Data Requirement.
etc.
ITEM 16 - Type of Service(s) for Stage 4. Enter the
ITEM 7 - Estimated Initial Cost of the System. This item
appropriate type of service(s) that applies or will apply to
is for information to show the general size and complexity
the equipment in the operational stage (Stage 4), as
of the system. It is not intended to be a determining factor
described in Chapter 6, Table of Services, Station
Classes, and Stations of the NTIA Manual. If the
in system review. For Stage 2 enter research cost, for
service is not in accordance with the allocation tables full
Stage 3 enter development cost, for Stage 4 enter unit cost
justification must be entered.
of equipment and expected number of equipments/systems
to be procured.
ITEM 17 - Station Class(es) for Stage 4. Enter the
appropriate station class(es) as described in Chapter 6
of the NTIA Manual.
DD FORM 1494, AUG 96
NTIA General Information Page (Back)

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business
Go
Page of 2