Form Ucc-F392 - Air Barrier And Insulation Checklist

Download a blank fillable Form Ucc-F392 - Air Barrier And Insulation Checklist in PDF format just by clicking the "DOWNLOAD PDF" button.

Open the file in any PDF-viewing software. Adobe Reader or any alternative for Windows or MacOS are required to access and complete fillable content.

Complete Form Ucc-F392 - Air Barrier And Insulation Checklist with your personal data - all interactive fields are highlighted in places where you should type, access drop-down lists or select multiple-choice options.

Some fillable PDF-files have the option of saving the completed form that contains your own data for later use or sending it out straight away.

ADVERTISEMENT

PERMIT # __________
LOT: __________ BLOCK: __________
AIR BARRIER
INSULATION CHECKLIST
AND
In the checklist below, AB and I stand for the air barrier and insulation inspection components to be verified. The local code official will always verify the I
components. In the case where the local code official is not verifying the AB components, they may be verified by a person independent of the insulation
installer,
or by the use of a blower door test.
If the permit holder has elected use of a blower door test, documentation of test results verifying air leakage less than 3 air changes per hour when tested per ASTM E 779
or ASTM E 1827 and reported at a pressure of 0.2 w.g. (50 Pa) shall be submitted with this checklist. A passing test demonstrates that the AB components are verifi
ed.
C
C
Y, N,
N/A
C
I
D
OMPONENT
RITERIA
OR
OMMENTS
NITIALS
ATE
Floors (including above-garage and cantilevered floors)
I
General
Insulation is installed to maintain permanent contact with underside of
subfloor decking.
Air barrier is installed at any exposed edge of insulation.
AB
Rim joists
Rim joists include an air barrier.
AB
Rim joists are insulated.
I
Walls
General
Corners and headers are insulated.
I
Junction of foundation and sill plate is sealed.
AB
Crawl space
Insulation is permanently attached to walls.
I
walls
Exposed earth in unvented crawl spaces is covered with Class I vapor
I
retarder with overlapping joints taped.
Space between window/door jambs and framing is sealed.
Windows and
AB
doors
Garage
Air sealing is provided between the garage and conditioned spaces.
AB
separation
Plumbing and
Insulation is placed between outside and pipes. Batt insulation is cut to
I
wiring
fit around wiring and plumbing, or sprayed/blown insulation extends
behind piping and wiring.
Showers and tubs on exterior walls have insulation.
Shower/tub on
I
exterior wall
Showers and tubs on exterior walls have an air barrier separating them
AB
from the exterior wall.
Air barrier extends behind boxes or air sealed-type boxes are installed.
Electrical/phone
AB
box on exterior
walls
Ceiling/Attic
Space between sklylight framing is sealed.
Skylights
AB
U.C.C. F392-1 (12/15)