This is a Federal Building
The items on the checklists below shall be inspected and tested. This list may not constitute all of the required inspecting and
testing of the fire and life safety system. Refer to the Seattle Fire Department Fire Code and adopted NFPA standards
for inspecting and testing requirements.
P
-T
C
RE
EST
HECKS
1. The Fire Alarm was put into test mode and/or other precautions were taken to avoid
Yes 
No 
preventable alarms.
Yes 
No 
2. This is the only Fire Pump at this address.
a. If “No” What is the unique ID number? (See SFC Ad Rule 9.02.09)_________
Yes 
No 
3. Routine maintenance is being performed (including weekly pump tests w/0 flow) and
records are being kept in accordance with NFPA 20 and NFPA 25
N/A 
Yes 
No 
4. The suction screens were inspected and cleared.
Yes 
No 
5. All signs, placards, and labels are provided on doors and system controls.
 Electrical based on NFPA 20 test procedures
E
P
LECTRIC
UMP
Flow
0 gpm (churn)
100% gpm
150% gpm
6. Amperage
Ph 1____ Ph2____ Ph3____
Ph 1____ Ph2____ Ph3____
Ph 1____ Ph2____ Ph3____
7. Voltage
Ph 1____ Ph2____ Ph3____
Ph 1____ Ph2____ Ph3____
Ph 1____ Ph2____ Ph3____
Yes 
No 
8. The electric pump ran properly for a minimum 10 minutes.
D
P
IESEL
UMP
Yes 
No 
9. Oil level is OK.
Yes 
No 
10. Coolant level is full.
Yes 
No 
11. The hydrometer reading indicates that the antifreeze protection is adequate.
Yes 
No 
12. The fuel filter/strainer was serviced.
Yes 
No 
13. The diesel engine/pump operated properly for a minimum 30 minutes.
P
C
(
)
UMP
ONTROLLER
S
Yes 
No 
14. The fire pump controller is listed and operates according to NFPA 20 standards
N/A 
Yes 
No 
15. The controller regulates the jockey pump as required by 2005 NFPA 20
Yes 
No 
16. The controller regulates the fire pump as required by 2005 NFPA 20
P
T
- R
C
(RC) ________ R
RPM_________ R
PSI/FT______/_____
UMP
EST
ATED
APACITY
ATED
ATED
17. When the Pump starts from pressure drop the start pressure is 5 psi below
N/A 
Yes 
No 
the start point of the jockey pump.
18. The pump runs smoothly without unusual noise or vibration. (For standards regarding
Yes 
No 
pump vibration see Hydraulics Institute Standards for Centrifugal, Rotary and
Reciprocating Pumps – Ref. NFPA 20 6.5.2 and 14.2.6)
19. The gauges passed a 5-year pressure gauge comparison test with a calibrated gauge.
Yes 
No 
Date for next test:______________
N/A 
Yes 
No 
20. Defective gauges were replaced or recalibrated.
21. The pump performs at its rated capacity (RC) and at 150% of its RC (or the capacity
Yes 
No 
that the supply will accommodate above the RC if it is less than 150%.)
22. Actual Test RPM:
Churn:____
100% RC_____
150% RC______
23. Pitot or Flowmeter Reading: Test Capacity (100%)_______ Test Peak Flow (150% ): _____ gpm
24. PSI reading on Discharge Gauge:
Pre-test_____ psi Churn (0 flow) _____ psi RC _____ psi 150% RC _____ psi
25. PSI reading on Suction Gauge:
Pre-test_____ psi Churn (0 flow) _____ psi RC _____ psi 150% RC _____ psi
26. Hose size:
_____ in.
Tip size:
_____ in.
Hose length:
________ ft.
Yes 
No 
27. The shaft seals are dripping water properly.
N/A 
Yes 
No 
28. The System pressure relief valve operates properly
N/A 
Yes 
No 
29. The Casing relief valve operates properly
Yes 
No 
30. The fire alarm panel monitors the fire pump