Confidence Test Report Form - Fire Pump - Seattle Fire Department Page 3

ADVERTISEMENT

This is a Federal Building
T
S
RANSFER
WITCH
31. A simulated power failure during peak flow automatically activated the
N/A 
Yes 
No 
transfer switch within 10 seconds.
32. After the automatic connection was made to an alternate power source
N/A 
Yes 
No 
peak flow was redelivered within 30 seconds.
33. The manual emergency transfer equipment operated properly during peak
N/A 
Yes 
No 
flow and peak flow was redelivered within 30 seconds.
F
C
INAL
HECKS
34. The Fire Alarm was removed from test mode and/or other
Yes 
No 
precautionary measures were removed to restore the connection to
N/A
the fire alarm system (includes removal of protective coverings).
35. The confidence test report was given to the owner and a current status
Yes 
No 
tag was posted.
DEFICIENCIES
Resolved 
Location:
Deficiency:
Recommended Resolution:
SFC and/or 2008 NFPA 25 reference:
2.
Resolved 
Location:
Deficiency:
Recommended Resolution:
SFC and/or 2008 NFPA 25 reference:
3.
Resolved 
Location:
Deficiency:
Recommended Resolution:
SFC and/or 2008 NFPA 25 reference:
Fire Pump
Page 3 of 4
9-2012 Ver.1.3

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Legal
Go
Page of 4