Form 605-006 - Annual Comprehensive Site Compliance Evaluation Report Page 4

ADVERTISEMENT

Exhibit 5 Annual Comprehensive Site Compliance Evaluation Report - Instructions
Instructions for Completing the Annual Comprehensive Site Compliance Evaluation Report
Form 605-006, Storm Water Discharges Associated with Industrial Activity
When to File an ACSCER Form:
How to complete the Comprehensive Site Compliance
Permittees who are presently covered under an issued
Evaluation Report Part B (see Section 4.2.17)
OPDES general permit for storm water discharges associated
1. Inspect all areas where materials or activities are
with
industrial
activity
must
submit
an
Annual
exposed to storm water, and areas where spills and
Comprehensive Site Compliance Evaluation Report by
leaks have occurred within the past 3 years.
st
March 1
of each year, beginning in 2012. This is in lieu of
2. Report industrial material, residue or trash on the
filing analytical benchmark discharge monitoring reports. If
ground that could contaminate or be washed away.
you need assistance or have questions, contact the Storm
3. Prevent leaks or spills from industrial equipment,
Water Program of the Environmental Complaints & Local
drums, barrels, tanks, etc.
Services of the DEQ at (405) 702-6100.
4. Prevent offsite tracking of industrial material or
Section I: Permit Information:
sediment.
Enter the existing OPDES General Storm Water Multi-
5. Prevent tracking or blowing of raw, final, or waste
Sector Industrial Permit number assigned to the facility
material from areas of no exposure to exposed areas.
identified in Section II.
6. Include evidence of, or potential for pollutants
Section II. Facility Operator Information:
entering the drainage system.
Give the legal name of the person, firm, public organization
Corrective Actions (see Part 4.2.17.3):
or any other entity that owns or operates the facility
1. Review to determine if revisions/modifications to
described in this application. The name of the operator may
eliminate problems or meet the effluent limits in this
or may not be the same name as the facility. The operator of
permit;
the facility is the legal entity that controls the facility's
operation, rather than the plant or site manager.
2. Document your discovery of any of the conditions
listed in Part 4.2.17.3.a and b within 24 hours and any
Section III: Facility/Site Location Information:
corrective actions to be taken to eliminate or further
Enter the facility’s official or legal name and complete
investigate the deficiency within 14 days of such
address, telephone, city, state, and ZIP code. If the facility
discovery.
lacks a street address, indicate the latitude and longitude of
3. Complete the corrective action report with the
the facility to the nearest 15 seconds.
information included in Part 4.2.17.3.d..
Section IV: Certification
st
The ACSCER form must be signed by a responsible party
Reporting is required by March 1
of the year
such as the owner or an officer, such as: president, vice
beginning in 2012.
president, secretary, and treasurer of either a corporation,
company, trust, partnership, or sole proprietorship by a
Where to file an ACSCER :
general partner or the proprietor. For a municipality, state,
DEQ - ECLS
Federal, or other public facility: by either a principal
Storm Water Program
executive officer or ranking elected official.
P.O. Box 1677
Oklahoma City, Oklahoma 73101-1677
4

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Legal
Go
Page of 4