Application For Electrical Permit Form - City Of Akron - Bldg. Insp. Division Page 2

ADVERTISEMENT

COMMERCIAL FEE SCHEDULE
OFFICE USE ONLY
Y N
/
/
CR#
PERMIT #
APPLICATION
PERMIT FEE
NEW
EXISTING
FEE
PERMIT TYPE
RATE
CONSTRUCTION
STRUCTURE
COMMERCIAL
Including Temporary and Permanent
25.00
Up to 500 SF
55.00
25.00
$
$
$
electric service, all wiring, fixture
501 - 2500 SF
85.00
40.00
installation, equipment connections
2501 - 7500 SF
155.00
75.00
& fire alarm, signaling communications
7501 - 8000 SF
160.00
85.00
data systems, swimming pools
Over 8000 SF
160.00 +.01 PSF
85.00+.01 PS
Addl.
Addl.
25.00
Separate Temporary Service
20.00
20.00
$
$
$
job trailer, etc)
$
Up to 2000 SF
25.00
25.00
$
20.00
Parking Structure
$
(parking deck)
2001 - 10,000 SF
25.00 MIN
25.00 Ml
+.01 SF
+.01 SF
10,001 & Up
100.00 MIN
50.00 Ml
+.008 SF
+.005 S
On Grade Parking Lot
25.00
$
20.00
20.00
$
$
Per Hole
Per Hole
25.00
Miscellaneous for Existing Occupancies $
Single circuit outlet
$
15.00
Miscellaneous wiring and/or up to 15
Add $1.00 per
20.00
outlet or KVA over 15
outlets or KVA new or replacement
equipment
>600v - to 400 amp
25.00
New Service Only
20.00
$
$
>600v - 400 to 800 amp
30.00
>600v - over 800 amp
50.00
Over 600 volts
75.00
Fire Alarm, Signaling,
25.00
Up to 3 devices
$
40.00
$
Each add'l (4-20)
Communications, and Data Systems
2.00
(when installed separate from any
21 - 100 devices
1.00
other electrical work) under
101 - up
.50
separate license or registration
Empty (UL approved) Raceways
25.00
$2.00/100 FT or fraction thereof
$
for future interior or exterior use
(all sizes) License not required
(installation per National Electric
for 50 volts or less
Code, Article 346 & 34 7)
Permit required
SUB-TOTAL
$
3% STATE FEE
$
TOTAL
$
INSPECTION FEES
Partial Rough Underground
25.00 per Trip
$
(With permit fee < $100)
Reinspection Fee (Due to inspection failed
25.00 per Trip
$
or no access)
Penalty (No permit taken)
200%
applelec.August 1998

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business
Go
Page of 2